Halstead EDEN X Type VBX 18 Installation And Servicing Instructions

Hide thumbs Also See for EDEN X Type VBX 18:

Advertisement

Halstead Boilers Limited, 20/22 First Avenue, Bluebridge Industrial Estate, Halstead, Essex C09 2EX.
Email: sales@halsteadboilers.co.uk or service@halsteadboilers.co.uk or training@halsteadboilers.co.uk
Halstead Boilers is continuously improving its products and may therefore change specifications without prior notice.
S E R V I C E H E L P L I N E : 0 1 9 2 6 8 3 4 8 3 4 T R A I N I N G : 0 1 9 2 6 8 3 4 8 3 8
Telephone: 01787 272800. Sales Direct Line: 01787 475557. Fax: 01787 474588.
Service Helpline: 01926 834834. Training: 01926 834838.
Website: www.halsteadboilers.co.uk
The statutory rights of the consumer are not affected.
09/04 751053
EDEN X TYPE
VBX 18 & 30
INSTALLATION AND SERVICING INSTRUCTIONS
G.C. Appliance No. 41-260-18 (Eden VBX 18 Propane)
G.C. Appliance No. 41-260-17 (Eden VBX 30 Propane)
O P E N V E N T C O N D E N S I N G B O I L E R
TO BE GIVEN TO THE USER
0086
EC 87/BP/35
G.C. Appliance No. 41-260-15 (Eden VBX 18)
G.C. Appliance No. 41-260-14 (Eden VBX 30)

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the EDEN X Type VBX 18 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Halstead EDEN X Type VBX 18

  • Page 1 G.C. Appliance No. 41-260-18 (Eden VBX 18 Propane) G.C. Appliance No. 41-260-17 (Eden VBX 30 Propane) Halstead Boilers is continuously improving its products and may therefore change specifications without prior notice. The statutory rights of the consumer are not affected.
  • Page 2: Table Of Contents

    INTRODUCTION ....... 0 The Halstead Eden VBX range are high efficiency condensing, Important Information .
  • Page 3: Important Information

    IMPORTANT INFORMATION GENERAL DESCRIPTION IT IS A STATUTORY REQUIREMENT THAT ALL GAS The appliances incorporate a microprocessor based, fully APPLIANCES ARE INSTALLED BY COMPETENT PERSONS, modulating air/gas ratio control system with direct burner (i.e. CORGI REGISTERED INSTALLERS) IN ACCORDANCE ignition, which provides a modulated heat output to central WITH THE GAS SAFETY (INSTALLATION AND USE) heating (CH) demand, and with internal frost protection provided REGULATIONS (CURRENT EDITION).
  • Page 4: Technical Specifications

    TECHNICAL SPECIFICATIONS GAS CATEGORIES These appliances are certified to comply with the requirements of Eden VBX 30 Propane, Eden VBX 18 Propane: EN 483, EN 677, and EN 625 for use in GB and IE (Great (G31 (Propane) with a regulated gas supply at 37 mbar 2H3P Britain and Ireland) using the following gas categories: (14.9 in.wg) inlet pressure).
  • Page 5: General Specifications

    GENERAL SPECIFICATIONS SHORT PARTS LIST Natural Gas and Propane versions Appliance VBX30 VBX18 Refer to Figure 49. Total weight (full) 38.1 32.6 G C Part No. Description No off Makers Pt No. Total weight (empty) 36.1 31.3 Ignition Electrode 500680 Max lift weight 28.1 24.7...
  • Page 6: Overall Dimensions & Minimum Clearances

    OVERALL DIMENSIONS AND MINIMUM CLEARANCES 9.11 FLUE SENSOR 9.13 CONTROL PCB Refer to Figure 48 Refer to Figures 22 & 27 a) Ensure supply voltage is isolated. a) Ensure supply voltage is isolated. b) Disconnect the electrical lead from the flue sensor. b) Unclip the user interface from its housing (see figure 22).
  • Page 7: Specification For Open Flued B33 Applications

    return pipe 'O' rings and fibre washers and replace as necessary. g) Unscrew the flue sensor from the existing flue hood and fit Standard concentric (ø100/60) vertical flue application, Figures 2.5.1 KIT A HORIZONTAL WALL TERMINAL Ensure that all joints and seals are correctly re-fitted. If required onto the new flue hood;...
  • Page 8 routed vertically alongside the outside wall to above the roofline. COMBUSTION CHAMBER COMBUSTION CHAMBER REAR Special seals are required to prevent rainwater penetrating the FRONT INSULATION INSULATION pipe joints. The design of the appliance is such that the combustion chamber For installation details refer to the flue kit instructions.
  • Page 9: Specification For Twin Flued (Type C53) Applications

    KIT F: SPLIT PIPE VERTICAL FLUE ADDITIONAL CONCENTRIC FLUE KITS GAS VALVE MOUNTING PLATE MANIFOLD MOUNTING SCREWS OUTLET (C53) - PART NO. 956080 The following additional concentric kits are available as optional This flue system kit is designed for installations where the air intake position is extras.
  • Page 10: Appliance Hydraulic Circuit

    6.1, and compared to the values stated in Performance Data, section 2.2. If the measured value does not correspond to the Performance Data, then contact: Halstead Boilers Ltd. Service Help line: 01926 834834 Refer to Figures 37, 38, & 39 a) Ensure supply voltage is isolated, and that the gas supply is isolated.
  • Page 11: Replacement Of Parts

    For further information position selected for installation should be within the building, contact: Halstead Boilers Ltd, Service Help Line: 01926 834834. unless otherwise protected by a suitable enclosure and MUST allow adequate space for installation, servicing and operation of the VENTILATION REQUIREMENTS appliance and for air circulation around it (Section 2.4 and 3.4).
  • Page 12: Condensate Disposal

    d) If the appliance is installed in a room or internal space with other LED CODE FAULT/EFFECT REASON ACTION FLUE TERMINAL POSITION opened flued appliances, the aggregate maximum rated input shall Check no air is in heat exchanger/CH system • be used to determine the air vent free-area.
  • Page 13: Draining Tap

    9 (Parts Replacement). products are available from Fernox and Sentinal. exists and the control is not in anti cycle mode, then replace PCB. For further information contact: Halstead Boilers Ltd. Service Help 3.13 OPEN VENTED WATER SYSTEM...
  • Page 14: Expansion Vessel

    Note: A higher initial design pressure requires a larger volume 3.17 EXPANSION VESSEL INTERNAL WIRING DIAGRAMS expansion vessel. A diaphragm type expansion vessel, conforming to the current The charge pressure must not be less than the static head of the 7.1 : FUNCTIONAL FLOW WIRING DIAGRAM issue of BS4814 (see also BS7074 Part 1 and 2) must be system, that is, the height of the highest point of the system above...
  • Page 15: Filling A Sealed Water System

    4. For Provision for filling the system at low level must be made, see further information contact: Halstead Boilers Ltd, Service Helpline: a) Check the operation of the pressure relief valve as described figure 8. There must be no permanent connection to the mains 01926 834834.
  • Page 16: Appliance Installation

    APPLIANCE INSTALLATION Before installing the appliance, check that the chosen location is PREPARING THE WALL suitable (section 3.2) and that the requirements for flue position a) Fix the paper template in the required position (ensuring that (section 3.3) and minimum clearances (Figure 1b) are satisfied. the necessary clearances are achieved).
  • Page 17: Central Heating Service Connections

    pipe be used to within 1000 mm of the gas service cock. ROUTINE SERVICING MOUNTING THE APPLIANCE CONDENSATE CONNECTION To ensure continued efficient operation of the appliance, it is from the igniter and detection electrodes. Refer to Figure 12. recommended that it is checked and serviced as necessary at e) Unscrew the screw holding the gas valve lead plug, and Connect either a Ø21.5mm or Ø22mm plastic push fit or regular intervals.
  • Page 18: Users Instructions

    Boiler Chip Card (BCC). appliance easier. This logbook forms part of the industry's Benchmark code of For further information contact: Halstead Boilers Ltd, Service Help EXTERNAL WALL Line: 01926 834834. practice for the installation, commissioning and servicing of SEALING RING central heating systems.
  • Page 19: Electrical Connections

    e) Ensure programmer and room thermostat (if fitted) are calling ELECTRICAL CONNECTIONS INLET PRESSURE TEST POINT for heat. Connect the electricity supply and external controls (using suitable f) The display changes to 'H'. The fan should start and after a mains cable) as follows: few seconds an ignition will commence.
  • Page 20: Heat Exchanger

    COMMISSIONING & TESTING FULLY PUMPED ‘Y’ PLAN Fully pumped 'Y' Plan Blue To aid venting, a manual air vent is provided on the Green/yellow FILLING THE WATER SYSTEM V4073A LHS of the heat exchanger. position zone Before commissioning the appliance, the whole gas installation valve Check the system for soundness.

Table of Contents