OUT-LINE OF INSTALLATION
Installation Works
2) Ceiling opening dimensions and hanging
3. Test running .............................................................................................. 15
Installation Parts
• Connecting cable
• Pipes: Gas side
Liquid side
(W 3/8 or M10 length
650mm)
• Insulated drain hose
• Additional Drain hose
(Inner Dia.............32mm)
2
Required Tools
• Level
• Screw driver
• Electric drill
• Hole core drill (ø70mm)
• Flaring Tools set
• Torque Wrenches
• Hexagonal Wrench
(4mm, 5mm)
• Gas-leak detector
• Owner's Manual