Commissioning And Testing - GEM KMG Series Installation And Maintenance Manual

Combination oven with direct steam and with steam generator
Table of Contents

Advertisement

13.1 • Check the appliance and the entire
installation straight after connecting.
Check in particular:
• there are no traces of the protective film on
the outside walls and the oven is empty;
• all the vents are clear;
• the connections are made as required and
instructed in this handbook;
• all the safety requirements of the current
standards, laws and directives are met;
• there is no leakage from the gas and water
connections;
• water drainage and flue gas extraction are
clear.
• Apply the adhesive with the warning signal
against the scalding danger at a height
from the ground of 1.6m.
13 •COMMISSIONING AND TESTING
90027360rev00
13.2 • Now proceed to light the oven as directed
in the user manual, checking the smooth
ignition of the burner.
13.3 • You should moreover check that the
silicone joints and sleeves of the water
circuit (oven vent, oven outlet, drip tray) do
not leak.
13.4 • Carefully refit the right-hand side that was
removed for the above work.
13.5 • For additional certainty that the appliance
i s o p e r a t i n g c o r r e c t l y , c a r r y o u t a
volumetric measurement of the quantity
of gas consumed. The meter will show
how much gas has been consumed over
a given period of time, and this value can
be checked against the values given in
Table 5 of the "Tecnical gas data" booklet.
13.6 • The test report must be completed in
full and submitted to the customer, who
should then sign in acceptance. With effect
from this moment, the appliance is covered
by the manufacturer's warranty.