Potterton NXR3 Installation, Operation And Maintenance Manual page 2

Table of Contents

Advertisement

Section 1
Fig. 1
-
General Data & Dimensions
Table 1
-
Boiler Dimensions
Table 2
-
Combustion Chamber Data
Table 3
-
Technical Data
-
Explanatory Notes
-
Clearances
Fig. 2
-
Boiler Clearances
Fig. 3
-
Boiler Footprint/Base Details
Section 2
-
General Information
-
Standard Supply
-
Controls
-
Optional Extras
-
Shipping / Packaging
-
Installation Standards
-
Boiler Siting & Base
Section 3
-
Ventilation
-
Flues (General)
-
Water Circulation Systems
-
Boiler Protection
-
System Water Quality
Section 4
-
Boiler Erection
-
Risk Assessment
-
Manual Handling
-
Personal Protective Equipment
-
Confined Spaces
-
Electrical Safety
-
Packaging Details
-
Preparation
-
C.O.S.H.H
-
Erection Checklist
-
Boiler Erection
Fig. 4
-
Section Assembly
Fig. 5
-
Section Orientation
-
Pulling Up Bars
Fig. 6
-
Boiler Fittings Assembly
-
Fittings Assembly
Fig. 7
-
Baffles Assembly
Fig. 8
-
Door Hinge Guide Assembly
-
Insulation & Casing Assembly
Fig. 9
-
Insulation Position
Fig. 10
-
Casing Support Frame
-
Casing Assembly
Fig. 11
-
Casing Side Panel Assembly
Fig. 12
-
Front Casing Assembly
Fig. 13
-
Casing Assembly
Fig. 14
-
Control Panel Configuration
Fig. 15
-
Control Panel Operation
Fig. 16
-
Cable/Capillary Tube Routing
INDEX
Page
1
Fig. 17
1
1
2
3
Fig. 18
4
Fig. 18A
4
4
5
5
5
Section 5
5
5
6
6
7
7
7
8
8
9
9
9
9
9
9
9
9
Section 6
10
10
Fig. 19
11
11
Fig. 20
12
Section 7
12
13
14
14
Fig. 21
14
Fig. 22
15
Fig. 23
15
15
16
16
16
17
18
18
20
-
Fitting Thermometer into Flue
-
Fitting the Burner
-
Connections
-
Single Phase Installation
-
Boiler & Burner Power Supply
-
Boiler & Burner Single Phase
Supply
-
Three Phase Installation
-
Volt Free Contacts
-
Connecting the Gas Supply
-
Connecting the Oil Supply
-
Connecting the Water System
-
Commissioning Check List
-
Contravention of Regulations
-
Boiler Commissioning
-
Safety Requirements
-
Emergency Instructions
-
Pre-Commissioning Dry Run
-
Soundness Testing
-
Commissioning Live Run
-
Additional Checks
-
Fault Finding
-
Overheat Operation
-
Burner Lockout
-
Boiler Maintenance
-
Cleaning Flue Surfaces
-
Natural Gas/LPG Fired Boilers
-
Class 'D' & 'C2' Fired Boilers
-
Sludge Gas
-
Boiler Ancillaries
-
Boiler Controls
-
Safety Interlocks
-
Boiler Wiring Diagram
-
Wiring Diagram – Legend
-
Pump Overrun Pipe Thermostat
-
NXR3 Boiler Parts List
-
Boiler Components
-
Casing Components
-
Instrument Panel Components
Page
20
20
21
21
21
21
21
21
21
22
22
23
23
23
24
24
24
24
24
25
25
25
25
26
26
26
26
26
26
26
26
27
28
28
29
30
32
34

Advertisement

Table of Contents
loading

Table of Contents