Baxi Combi 80e Installation And Servicing Instructions page 8

Gas fired wall mounted combination boiler
Table of Contents

Advertisement

Appliance Type
Appliance Category
Heat Input C/H & DHW (Gross)
Max
kW
34.3
Btu/h
117,036 40,610
Heat Output
Max
kW
31.0
Btu/h
105,776 35,490
Max Gas Rate (Natural Gas - G20)
(After 10 Mins)
m
3
/h
3.63
ft
3
/h
128.12
Burner Pressure (Natural Gas - G20)
Max Rate
mbar
13.4 ± 0.5
in wg
5.36 ± 0.2
Inlet Pressure (Natural Gas - G20)
mbar
20
in wg
8
Burner Injector (Natural Gas - G20)
15 x 1.28mm Diameter
Electrical Supply
(Appliance must be connected to an
earthed supply)
Power Consumption
External Fuse Rating
Internal Fuse Rating
Fuse 2A Fast Blow to BS 4265
Electrical Protection
IPX5D
SEDBUK Declaration For Combi 105e
The seasonal efficiency (SEDBUK) is 78.5 %
This value is used in the UK Government's Standard
Assessment Procedure (SAP) for energy rating of dwellings.
The test data from which it has been calculated have been
certified by 0051.
LPG Gases Propane - G31
Burner Injector 15 x 0.77mm diameter
Burner Pressure
Max Rate
Propane
mbar
in wg
Inlet Pressures
mbar
in wg
8
C
C
NO x Class
12
32
CAT II
Flue Terminal
2H 3P
Dimensions
Min
Connections
11.9
Gas Supply
Central Heating Flow
Central Heating Return
Cold Water Mains Inlet
Min
DHW Flow
10.4
Pressure Relief Discharge -
Outercase Dimensions
Casing Height
Overall Height Inc Flue
Elbow
Casing Width
Casing Depth
Min Rate
Clearances
1.8 ± 0.2
Both Sides
Above Casing
0.72 ± 0.2
Below Casing
Front
Front
Weights
Packaged Boiler Carton
Packaged Flue Kit
Installation Lift Weight
230V~ 50H z
Central Heating Primary Circuit
Pressures
190W
Safety Discharge
Max Operating
3A
Min Operating
Recommend Operating
Recommended System
Temperature Drop
Min Rate
36.2
6.4
14.5
2.6
37
4.0 Technical Data
4.2
Combi 105e
3
Diameter
100mm
Projection
95mm
copper tails
-
22mm
-
22mm
-
22mm
-
15mm
-
15mm
15mm
-
780mm
-
980mm
-
450mm
-
345mm
5 mm Min
200 mm Min
200 mm Min
450 mm Min
(For Servicing)
5 mm Min
(In Operation)
kg
49
3
41
bar
3
2.5
0.5
1-2
11°C
20°F
Pump - Available Head
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
0
0
200
400
l/h
DHW Circuit
bar
Pressures
Max Operating
8
Min Operating
0.2
Min Operating Pressure
at 12.7 l/min
0.96
Flow Rates
l/min
DHW Flow Rate
@ 30°C Rise
14.8
DHW Flow Rate
@ 35°C Rise
12.7
Min Working
DHW Flow Rate
2.5
Pump
Available Head
See graph below
Expansion Vessel - (For Central Heating
only. Integral with appliance)
bar
Min Pre-charge Pressure
0.5
litre
Max Capacity of
CH System
125
Primary Water Content
1.2
of Boiler (unpressurised)
Temperatures
C.H. Flow Temp
(adjustable)
35°C to 85°C
D.H.W. Flow Temp
(adjustable)
35°C to 65°C
dependent upon flow rate
600
800
1000
1200
(± 5°C)
max
(± 5°C)
max

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Combi 105e

Table of Contents