Window/Storm Window Requirements - Quirky AROS Operating Instructions Manual

Smart window air conditioner
Hide thumbs Also See for AROS:
Table of Contents

Advertisement

1
WINDOW REQUIREMENTS
• These instructions are for a standard double-hung window.
You will need to modify them for other types of windows.
• The air conditioner can be installed without the side extensions if
needed to fit in a narrow window. See the window opening dimensions.
• All supporting parts must be secured to firm wood, masonry or metal.
• The electrical outlet must be within reach of the power cord.
• Follow the dimensions in the table and illustration.
A
B
13" min
22.38"
|
AROS
8
A
B
with extensions
2
STORM WINDOW REQUIREMENTS
A storm window frame will not allow the air conditioner
to tilt toward the outside, and will keep it from draining
properly. To adjust for this, attach a piece of wood to the sill.
• Width: 2"
• Length: Long enough to fit inside the window frame.
• Thickness: To determine the thickness, place a piece
of wood on the sill to make it 1/2" higher than the top
of the storm window frame or the vinyl frame.
Attach securely with nails or screws provided by the installer.
1/2" higher than
1/2" higher than vinyl frame
storm window frame
(on some windows)
wood
sill
storm
window frame
vinyl frame
3
ATTACH THE TOP-MOUNTING RAIL SEAL STRIP
Remove backing from top-mounting rail seal strip and
adhere it to the bottom of the top-mounting rail.
top mounting rail
remove backing seal from seal strip
FRONT VIEW
top mounting rail
seal strip
AROS
|
9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Aros bowac8000

Table of Contents