Installation

Installation and service access

Dehumidifier DehuTech 2400 is designed for
indoor installation, and must be installed in a
upright position, preferably bolted to the floor.
For inspection and service, a space of 800 mm
must be left free in front of the dehumidifier to
accommodate for servicing of filters, fans and
rotor.
Also ensure a space of 600 mm above the
dehumidifier for inspection and service of the
electrical panel, which is placed on top of the
dehumidifier.
Duct connection for permanent
installation
The dehumidifier can be installed in the room
that should be dehumidified or in a separate
room.
To obtain the best performance the outlets from
the fans should be equipped with diffusors.

Wet air duct out from dehumidifier

The wet air from the dehumidifier should be
exhausted to the outside. The duct should be as
short as possible to minimise the chance of con-
densation of the wet air. This duct should slope
down slightly to stop any condensed water from
flowing back into the dehumidifier.
If the wet air duct is extremely long, or must be
installed sloping upwards from the dehumidifier,
it should be insulated and have a drainage point
(2-4 mm) drilled at its lowest position.
A damper should be installed in the wet air duct
to enable correct setting of the reactivation air
volume during commissioning.
The exhaust opening should have a coarse wire
net.
Subject to change without notice

Reactivation air into the dehumidifier

The reactivation air duct into the dehumidifier
should be as short as possible. The intake open-
ing of the duct should have a coarse wire net, to
stop foreign objects from entering the dehumidi-
fier. No insulation is needed and the duct can
slope up- or downwards. In some installations,
as an alternative, the reactivation air can be
taken from the installation room, for this alterna-
tive no duct connection is needed.
Process and dry air with the dehumidifier
installed in the dehumidified room
When the dehumidifier is installed in the dehu-
midified room it would normally take the proc-
ess air direct from the room without any duct
system, with only a protection net for the inlet
required. The dry air outlet would normally have
a duct system designed for distribution of the
dry air in the building.
Process and dry air with the dehumidifier
installed outside the dehumidified room
When the dehumidifier is installed in a separate
room all inlet and outlet openings are usually
ducted.
The dehumidifier takes the process air as ambi-
ent air, or as pre-treated air (cooled/heated), or
alternatively as return air from the dehumidified
room. The dry air from the dehumidifier can be
connected for post treatment or ducted back to
the dehumidified room.
A damper can be installed in the process air
duct, enabling correct commissioning of the dry
air volume.

Electrical installation

See the electrical wiring diagram in appendix 1.