Step 5 - Field Fabricate Ductwork; Step 6 - Rig And Place Unit - Carrier 48HC Installation Instructions Manual

Single package rooftop gas heating/electric cooling unit with puronr (r-410a) refrigerant sizes: 04, 05, 06
Table of Contents

Advertisement

Fig. 5 - - Unit Leveling Tolerances
Step 5 — Field Fabricate Ductwork
Cabinet return-air static pressure (a negative condition)
shall not exceed 0.35 in. wg (87 Pa) with economizer or
0.45 in. wg (112 Pa) without economizer.
For vertical ducted applications, secure all ducts to roof curb
and building structure. Do not connect ductwork to unit.
Fabricate supply ductwork so that the cross sectional
dimensions are equal to or greater than the unit supply
duct opening dimensions for the first 18 in. (458 mm) of
duct length from the unit basepan.
Insulate and weatherproof all external ductwork, joints,
and roof openings with counter flashing and mastic in
accordance with applicable codes.
Ducts passing through unconditioned spaces must be
insulated and covered with a vapor barrier.
If a plenum return is used on a vertical unit, the return
should be ducted through the roof deck to comply with
applicable fire codes.
A minimum clearance is not required around ductwork.
"B"
REQUIRED
SPREADER
BARS
"A"
MAX WEIGHT
UNIT
LB
48HC --- A04
760
48HC --- A05
895
48HC --- A06
930
NOTES:
1. SPREADER BARS REQUIRED — Top damage will occur if spreader bars are not used.
2. Dimensions in ( ) are in millimeters.
3. Hook rigging shackles through holes in base rail, as shown in detail "A." Holes in base rails are centered around the unit center of
gravity. Use wooden top to prevent rigging straps from damaging unit.
MAXIMUM ALLOWABLE
DIFFERENCE IN. (MM)
A-B
B-C
A-C
0.5" (13)
1.0" (25)
1.0" (25)
C06110
36"- 54"
(914-1371)
"C"
SEE DETAIL "A"
KG
IN
345
74.5
407
74.5
423
74.5
Fig. 6 - - Rigging Details
!
PROPERTY DAMAGE HAZARD
Failure to follow this caution may result in damage
to roofing materials.
Membrane roofs can be cut by sharp sheet metal
edges. Be careful when placing any sheet metal parts
on such roof.
Step 6 — Rig and Place Unit
Keep unit upright and do not drop. Spreader bars are
required. Rollers may be used to move unit across a roof.
Level by using unit frame as a reference. See Table 1 and
Fig. 6 for additional information.
Lifting holes are provided in base rails as shown in Fig. 6.
Refer to rigging instructions on unit.
Before setting the unit onto the curb, recheck gasketing on
curb.
!
UNIT DAMAGE HAZARD
Failure to follow this caution may result in
equipment damage.
All panels must be in place when rigging. Unit is not
designed for handling by fork truck when panels or
packaging are removed.
If using top crate as spreader bar, once unit is set,
carefully lower wooden crate off building roof top to
ground. Ensure that no people or obstructions are
below prior to lowering the crate.
PLACE ALL SEAL STRIP IN PLACE
BEFORE PLACING UNIT ON ROOF CURB.
DUCT END
DIMENSIONS
A
MM
IN
1890
38.0
1890
38.0
1890
37.5
9
CAUTION
CAUTION
DETAIL "A"
B
C
MM
IN
965
33.5
965
41.5
955
41.5
C11292
MM
850
1055
1055

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

48hc series48hc-a0448hc-a0548hc-a06

Table of Contents