Three Speed Gearbox Gearcharge Control Linkage; Automatic Transmission/Gearchange Control Linkage - Datsun 510 series Workshop Manual

Hide thumbs Also See for 510 series:
Table of Contents

Advertisement

THREE SPEED GEARBOX
GEARCHANGE CONTROL LINKAGE
Fig
F 35
As
previously
described the three
speed gearbox
is
equipped
with
a
steering
column
gearchange linkage
system
which
incorporates
a
collapsible
control rod when combined
with the
collapsible
type of
steering
column
assembly
The
gearchange linkage
can
be removed and
inspected
in
the
following
manner
Remove the
steering
wheel
Fig
F 36
and take off the
steering
column shell
cover
Remove the
turn
signal
and
lighting
switch
Fig
F
3 7
These removal details
can
also be found in
the section STEERING Remove the
C
washer
I
in
Fig
F 3 8
and the washer then
remove
the
upper
support
bracket
by
releasing
the
locating
bolt and
screw
The control rod insert with
bush and
return
spring
can now
be removed
Remove the
snap
and
gear
lever
pivot pin
and withdraw the
gearlever
Remove the
cotter
pin plain
washer and
spring
washer and
disconnect the shift rods from the
gear
selector levers
Fig
F 39
Unscrew the bolts
securing
the lower
support
bracket and the
clamp
Remove the
clamp
and
gear
change
lever retainer
Remove the second third
speed
selector lever the lower
support bracket and the first
reverse
selector lever from the
control rod Withdraw the control rod Disconnect the gear
change
rods
by removing
the
cotter
pins
and
remove
the
cross
shaft bracket from the side member Withdraw the
cross
shaft
assembly Fig
F 40
Examine the
components
for
signs
of
wear
and
damage
and
replace
if
necessary
Installation is
a
reversal of the removal
procedure noting
the
following points
Take
care
not to
strike
or
apply
a
load
to
the
collapsible
type
of control rod
or
the rod
may
be
damaged
The rod should
not
be slack
in
the axial direction when
installed and
must
be removed if slackness is detected Coat
the
sliding
surfaces with
grease
before
assembling
them
Acijusting
Set the
gear
lever
to
the neutral
position
and
temporarily
connect
the trunnion
on
the lower
support
bracket
to
each rod
Fig
F41
Set the rod
on
the lever
so
that the neutral
adjustment
grooves
on
the
upper
surface of the lower support bracket
are
aligned
with the grooves
on
each lever
When the
adjustment
is
completed
operate the gear lever
to
select each
gear
and make
sure
that the lever
can
be moved
smoothly
and
positively
AUTOMATIC TRANSMISSION
Gearchange
control
linkage
The automatic transmission
gear
change
control
linkage
can
be removed in
a
similar
manner
to
the three
speed gearbox
linkage Carry
out
the
operations previously
described under
the
relevant
heading
as
far
as
the removal of the
gear
lever and
proceed
as
follows
Disconnect the upper selector rod from the selector lever
by removing
the
cotter
pin plain
washer and lock washer
See
Fig
F 42
Remove the
speed
range
position plate
the
snap
ring
at
the lower end of the control rod and
unscrew
and
remove
the lower
support
bracket Release the
locking
screw
and with
draw the selector lever
assembly
Withdraw the control rod
disconnect the selector rods and
remove
the
cross
shaft bracket
and
cross
shaft
assembly
Clean all
parts
and
repair
or renew
any
part which is
worn or
damaged
Installation is
a
reversal of
the removal
procedure noting
the
following points
Coat all the
sliding
surfaces with chassis grease
prior
to
assembling
Set the
converter
side lever and the gear lever in the neutral
position
Install the upper selector rod
to
the selector lever and
adjust
the gear
position plate
to
give
a
clearance of 0 5
I Omm
0 02
0 04 in between the selector lever
stop pin
and the
position plate
The
adjustment
can
be obtained
by turning
the
selector rod
adjusting
nuts
Finally tighten
the
nuts
on
each
side of the trunnion
S9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents