Wiring Schematics - Geostar Aston Series Installation Manual

Geothermal
Hide thumbs Also See for Aston Series:
Table of Contents

Advertisement

ASTON SERIES INSTALLATION MANUAL

Wiring Schematics

Aurora Advanced with ECM and GeoStart
Ext Pump
Pump
1/2 hp Total
G
208-230/60/1
Pump
Variable
Speed
VS
G
Pump
Pump
208-230/60/1
PRESSURE
TRANSDUCER
GND
1
Black
OUT
2
White
5DC
3
Red
REFRIGERATION
OPTION
Brown
T
Brown
Gray
T
Gray
FLOW METER
GND
3
3
Green
OUT
2
2
White
5DC
4
4
Brown
Purple
T
Purple
White
T
White
PERFORMANCE
OPTION
Pump Slave
Input/Output
VARIABLE
SPEED PUMP
LOW VOLTAGE
Brown
10DC
1
1
GND
2
2
Blue
PWM
3
3
Black
NA 4
4
NOTE: 7
Future Use
Smart Grid
Home
Automation
Figure 1:
Optional Internal
Hot Water
Generation Pump
Wiring Schematic
COM
DHW
Cabinet
Pump
HW Switch
Blue
3
1
AXB Accessory 2 DIP Se ngs
SW1-4
SW1-5 DESCRIPTION
ON
ON
Cycles with Blower
OFF
ON
Cycles with CC rst stage compressor or compressor spd 1-12
ON
OFF
Cycles with CC2 second stage of compressor or comp spd 7-12
OFF
OFF
Cycles with DH from ABC board
1
Orange(9)
1
PB1
2
2
Brown(10)
NOTE 8
See Figure 1 for
DHW wiring.
Status
G
AXB™
(Aurora Expansion Board)
Modbus Add. ID
Acc 2 – Dip 1
Acc 2 – Dip 2
Connects to L2
K6 Relay
and NO on
AXB Board
NO
L2
Blue
Purple
2
Violet(8)
Violet(7)
White
Dehumidification Output
White
Black
Solenoid
Black
Valve
Orange
Analog Output 0-10VDC
Orange
Blue
Blue
Red
Red
Black
Black
Brown
Brown
OFF
ON
1
PRESSURE
Future Use
2
TRANSDUCER
3
Black
1
GND
Future Use
White
2
OUT
4
Red
3
5DC
5
REFRIGERATION
OPTION
SW1
Blue
T
Blue
Pink
Pink
T
HOT WATER
OPTION
40
Accessory 2
SV
Output
Compresso
r
Start CT
Compressor
Run CT
NOTE 6
Auxiliary
Heat CT
GND
24 VAC
NOTE 5
0-10DC
Blower CT
Notes
1 - Switch blue and red wires for 208V operation.
2 - The blk/wh and gray/wh wires are removed when Aux Heat is installed
3 – When Auxiliary Heat is field installed the harness will then be connected to
the auxiliary heat unit. The auxiliary heat unit will then power the blower. Refer to
EAS/EAM/EAL Auxiliary Heat kit installation instructions.
4 - Wires provided for Auxiliary Heat low voltage control. Wires are secured at blower.
5 – Brown blower power wire routed through Current Transducer two times.
6 – Field Connected: Refer to Installation Manual and Auxiliary Heat Instructions for
Current Transducer installation.
7 – Variable speed pump low voltage harness provided with Variable Speed Flow Center.
8 – Variable speed pump power wires to connect the pump to L1 and L2 on the AXB board
are provided with Variable Speed Flow Center.
Legend
Factory Low voltage wiring
T
Factory Line voltage wiring
Field low voltage wiring
G
Field line voltage wiring
Optional block
DC Voltage PCB traces
Junction
Quick connect terminal
Wire nut
L1
Field wire lug
Ground
Relay Contacts-
2
3
N.O., N.C.
P
Fuse
Breaker
PB1, PB2 -
CC -
Compressor Contactor
CO -
Condensate overflow sensor
PS -
RV -
K5 -
DHW pump relay
K6 -
Loop pump relay
SW1 -
PSC Fan Speed Relay
SW1 -
CR3 -
SW2 -
CR4 -
PSC Fan Power Relay
CS -
Compressor Solenoid
TS -
F1 and F2 -
Fuses
HWL -
HE -
Heater element
SC -
HP -
High pressure switch
SR -
ER1 to ER4 -
Aux heat stage relays
WCL -
LP -
Low pressure switch
97P840-18
MODULATING VALVE
AXB BOARD
1
2
C
3
R
ABC BOARD
Thermistor
Light emitting diode - Green
Relay coil
Capacitor w/ bleed resistor
Switch - Condensate overflow
Switch - High pressure
Switch - Low pressure
1
Polarized connector
Current Transducer (CT)
Power blocks
Power strip
Reversing Valve coil
DIP package 5 position AXB
TEST MODE ABC Board
DIP package 8 position ABC Board
Thermal limit switch
Hot water limit sensor
Start Contactor
Start Relay
Water Coil Limit Sensor
8/24/12

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents