Adjustments; Start Up Checklist; Working Height - Gearmore RE1000 Operation, Service & Parts Manual

Double spinner spreader
Table of Contents

Advertisement

6. ADJUSTMENTS

6.1 START UP CHECKLIST

IMPORTANT!
Before every start-up, check the following safety devices:
● Guards of the driveshaft
● Guards of the hopper agitator
● Fixed guards (of rotary discs, against projection of material towards the tractor, of the drive
elements)
● Fixing knob of rotary spreading discs
Do not load the hopper over the edge to avoid the loss of fertilizer during the work and travel.
Proper hopper fi lling - the fertilizer does not exceed the hopper edge
Improper hopper fi lling - the fertilizer exceeds the hopper edge

6.2 WORKING HEIGHT

32 Inches between the ground
level and the distribution disc
height.
11

Advertisement

Table of Contents
loading

Table of Contents