Technical Data; Troubleshooting; Steam Station Does Not Work - Earlex SteamStation SC300 User Manual

Earlex steamstation sc300 user's manual
Hide thumbs Also See for SteamStation SC300:
Table of Contents

Advertisement

Technical data

• 2.5 metre power cord
• Water capacity - 1200ml
• Steam-up time – up to 7 minutes
depending on volume of water
• Working time – 30 minutes
• Tank material - Stainless Steel
• Voltage - 220-240V
• Frequency - 50-60Hz
• Power - 1500W
• Hose 3m

Troubleshooting

• Water comes out of the nozzle
The SteamStation creates a large amount
of steam. This may condense as water or
water droplets in the steam hose and can
be expelled when used after a period of
cooling. This is normal and not a cause for
concern.
• No steam comes out
Check that the hose has not become kinked
or blocked. Also check the power supply and
water level.
We declare that the unit SC300 conforms to: LVD 2006/95/EC, EN 60335-2-54, EN 60335-1,
PAH ZEK 01.2-08, EMF EN 62233; EMC 2004/108/EC, EN 55014-1, EN 55014-2,
2013 © Earlex Ltd
• I cannot remove the Steam Cap (6)
Make sure that you have fully de-pressurized
the boiler. See the section 'Refilling the
water tank' page 6 and allow to cool.
• Steam flow is erratic; sometimes it
works well, other times it does not
If you have not used distilled or deionized
water, you may have a small blockage inside
your SteamStation. Try descaling your unit.
Check all attachments are fitted correctly.
• I live in a hard water area, my
>
SteamStation does not work as well
Empty the boiler after use. In hard water
areas your SteamStation may benefit from
occasional descaling. To ensure
>
SteamStation operates correctly over a
>
long period, rinse out the water tank once a
>
month to remove lime-scale desposits. White
>
vinegar or a proprietary de-scaler solution
>
can be used.
EC Declaration of Conformity
EN 61000-3-2, EN 61000-3-3.
Tim Hopper-Technical Director
Made in China
> > > > >> >
>
M0715
01/13

Advertisement

Table of Contents
loading

Table of Contents