Supply & Load Cable Connections - Philips Dynalite DLE220-S Installation Manual

2 x 20a leading edge dimmer
Table of Contents

Advertisement

supply and load cable connections
Supply Cables
The supply input terminals are located toward
the top left of the enclosure and consists of
Neutral, Line, and an Earth link located on the
2
chassis, all of which will accept up to 10mm
cables.
The supply cables should have a
capacity of at least 40A.
Load Cables
Load cables can be terminated on the 2 way
Load terminal strip. These connectors will
2
accept up to 10mm
cables. Calculate the
intended load, and ensure that it is below the
maximum capacity of an individual channel,
which is 20A. Derate for reactive loads.
Energising the Device
If it is necessary to energise load circuits
before any control cables are connected, it is
acceptable to replace the cover and energise
the device immediately, as the default factory
programming is to have all channels set to
100% output. If there is no output on any or
all channels, see the Troubleshooting section
(page 7). The device should be de-energised
before terminating the control and data
cables.
5
DLE220-S Instruction Manual Rev F.doc

Advertisement

Table of Contents
loading

Table of Contents