Nordyne TC Upflow/Horizontal Installation Instructions Manual page 50

Two-stage condensing furnaces with fixed and variable speed blowers
Table of Contents

Advertisement

PVC
Option
Cap
9
See View -E-
VIEW -E-
Inline
Drain
NOTES:
1.) All drain lines must be trapped with J-Trap or field supplied loop.
2.) Drain line traps may be positioned inside or outside the cabinet.
PVC
Option
Cap
12
See View -E-
50
1 Pipe Downflow
PVC TEE
and Reducer
Drain Line
Attached to
1/2 x 1/2
Hose Barb
Header Box
Drain
2 Pipe Downflow
PVC TEE
and Reducer
Drain Line
Attached to
1/2 x 1/2
Hose Barb
Figure 39. Downfl ow Options
Option
10
See
View -F-
Drain Line Attached
to 1/2 x 1/2 Hose Barb
VIEW -F-
Inline
Drain
Header Box
Drain
Option
13
See
View -F-
Drain Line Attached
to 1/2 x 1/2 Hose Barb
Option
11
See Table 2 for
2" PVC Pipe Length
(Field Supplied)
X
PVC TEE
and Reducer
VIEW -G-
Inline Drain -
This drain
not needed if "X"
is less than 6".
Option
14
See Table 2 for
2" PVC Pipe Length
(Field Supplied)
PVC TEE
X
and Reducer
PVC
Cap
See View -G-
Header Box
Drain
PVC
Cap
See View -G-

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tl downflow

Table of Contents