Part 3: Prepare Boiler Location; Boiler Location Should Be Level - Munchkin Gas-fired Hot Water Boiler Manual

Hide thumbs Also See for Gas-fired Hot Water Boiler:
Table of Contents

Advertisement

GAS-FIRED BOILER

PART 3: PREPARE BOILER LOCATION

A. BOILER LOCATION SHOULD BE LEVEL
When preparing the boiler location, make sure the area where you are placing the boiler is level. In order
for the condensate to flow to the location of the condensate hose, the boiler must be slightly pitched
back to assure proper flow direction. The Munchkin Boiler comes equipped with leveling feet. Should
you find the floor beneath the boiler is uneven, with a wrench, adjust the leveling feet so the boiler is
pitched back at 1/8" per foot
INCORRECT
CAUTION
Boiler Manual
CORRECT
8

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Heattransfer t50mHeattransfer t80mHeattransfer 399m

Table of Contents