Baxi Potterton Combi 24 HE Installation & Service Instructions Manual page 18

Wall mounted powered flue condensing combination boiler gas fired central heating unit
Hide thumbs Also See for Combi 24 HE:
Table of Contents

Advertisement

7.0
SITE REQUIREMENTS
7.8
Flue Dimensions
The standard horizontal flue kit allows for flue lengths
between 100mm and 685mm from elbow to terminal
(Fig. 16).
The maximum permissible
flue length is: 4 metres.
7.9
Flue Trim
1. The rubber flue trim supplied may be fitted to either
the outside wall or on the inner wall of installation.
7.10
Terminal Guard (Fig. 17)
1. When codes of practice dictate the use of terminal
guards, they can be obtained from most Plumbers' and
Builders' Merchants.
2. There must be a clearance of at least 50mm
between any part of the terminal and the guard.
3. When ordering a terminal guard, quote the appliance
name and model number.
4. The flue terminal guard should be positioned
centrally over the terminal and fixed as illustrated.
r:..'O~~~
.#" 'U
.
"'~
.
'\\)\)\,.
Fig. 16
--------
'---,
Fig. 17

Advertisement

Table of Contents
loading

This manual is also suitable for:

Main combi 24 he

Table of Contents