Vaillant eco TEC plus 415 Instructions Manual page 79

Wall hung open vent condensing boiler
Table of Contents

Advertisement

Fig. 4.12: Routing around roof eaves
Supplied by HeatingSpares247.com
INSTALLATION OF THE VARIABLE TERMINATION KIT
Routing around roof
eaves
When routing the variable
termination kit around the roof eaves,
additional lengths of M8 threaded
bar will be required for the support
brackets. Threaded bar can be
purchased from most local merchants.
• Change the bird protection grille
from the 87° elbow to the
extension installed at the end.
If using the 87° elbow, use the
seal from the pipe extension.
• The final pipe extension must be
fixed to the wall using two support
clips with a minimum distance of
400 mm.
• Additional 45° bends may be
required.
27

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eco tec plus 418Eco tec plus 428Eco tec plus 438

Table of Contents