Delivered gas
Output [kW]
Burner pressure
Natural gas 2H
Main burner jet mark
2)
for G20
7/120
Burner pressure
LPG 3+
Main burner jet mark
2)
for G30
7/072
for G31
Table G.2: Burner pressure
Delivered gas
Output [kW]
Gas Rate
Natural gas 2H
Main burner jet mark
2)
per G20
7/120
Table G.3: Gas flow rate
Burner Pressure
Ignition
10.4
12.0
14.0
16.0
rate
1)
[mbar]
2.9
3.7
1.8
1.8
2.2
1)
[mbar]
4.2
4.2
5.1
6.6
8.2
8.7
11.1
5.5
5.5
6.7
Gas Rate
10.4
12.0
14.0
16.0
1)
[m
3
/h]
1.3
1.5
1.7
1.9
GAS SUPPLY ADJUSTMENTS
(COMMISSIONING PART II)
18.0
20.0
22.0
24.0
26.0
28.0
4.7
5.6
6.8
8.0
9.4
10.8
10.4
12.8
15.5
18.2
21.3
24.6
13.7
16.8
20.2
23.8
27.8
32.0
18.0
20.0
22.0
24.0
26.0
28.0
2.1
2.4
2.6
2.8
3.1
3.3
Burner pressure and Gas
rate
1)
15 °C, 1013 mbar, dry
2)
The nozzles are stamped with the values shown in
this table. The marking corresponds to the nozzle
hole diameter multiplied by 100.
3)
1Ignition rate
1)
15 °C, 1013 mbar, dry
2)
The nozzles are stamped with the values shown in
this table. The marking corresponds to the nozzle
hole diameter multiplied by 100.
37