Continental Fireplaces CDV70NT-S Installation And Operation Instructions Manual
Continental Fireplaces CDV70NT-S Installation And Operation Instructions Manual

Continental Fireplaces CDV70NT-S Installation And Operation Instructions Manual

Vented gas fireplace heater direct vent millivolt system

Advertisement

INSTALLER: THESE INSTRUCTIONS MUST BE CONVEYED TO AND REMAIN WITH THE HOMEOWNER.
CERTIFIED UNDER CANADIAN AND AMERICAN NATIONAL STANDARDS, CSA 2.33, ANSI Z21.88 FOR VENTED GAS FIREPLACE HEATERS
VENTED GAS FIREPLACE HEATER
DIRECT VENT MILLIVOLT SYSTEM
INSTALLATION AND OPERATION INSTRUCTIONS FOR:
WARNING: If the information in these instructions is not followed exactly, a fire or
explosion may result causing property damage, personal injury or death.
Do not store or use gasoline or other flammable vapours and liquids in the vicinity of
• Do not try to light any appliance.
• Do not touch any electrical switch.
• Do not use any phone in your building.
Installation and service must be performed by a qualified installer, service agency
Wolf Steel Ltd., 24 Napoleon Rd., Barrie, ON L4M 4Y8 Canada • (705)721-1212 • fax(705)722-6031
$10.00
NATURAL GAS MODEL
PROPANE GAS MODEL
CERTIFIED FOR CANADA AND UNITED STATES USING ANSI / CSA METHODS
FOR YOUR SAFETY
this or any other appliance.
WHAT TO DO IF YOU SMELL GAS:
or the gas supplier.
www.continentalfireplaces.com • ask@continentalfire.com
CDV70NT-S
CDV70PT-S
• Immediately call your gas supplier from a
neighbor's phone. Follow the gas supplier's
instructions.
• If you cannot reach your gas supplier, call
the fire department.
1
W415-0570 / B / 11.30.07

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CDV70NT-S and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Continental Fireplaces CDV70NT-S

  • Page 1 CERTIFIED UNDER CANADIAN AND AMERICAN NATIONAL STANDARDS, CSA 2.33, ANSI Z21.88 FOR VENTED GAS FIREPLACE HEATERS VENTED GAS FIREPLACE HEATER DIRECT VENT MILLIVOLT SYSTEM INSTALLATION AND OPERATION INSTRUCTIONS FOR: CDV70NT-S NATURAL GAS MODEL CDV70PT-S PROPANE GAS MODEL CERTIFIED FOR CANADA AND UNITED STATES USING ANSI / CSA METHODS WARNING: If the information in these instructions is not followed exactly, a fire or explosion may result causing property damage, personal injury or death.
  • Page 2: Table Of Contents

    TABLE of CONTENTS PG2-5 INTRODUCTION Log Placement Charcoal Embers Warranty Glowing Embers Dimensions Logo Placement General Instructions NIGHT LIGHT Replacement General Information In line Switch Care of Glass & Plated Parts 5-10 VENTING BLOWER INSTALLATION Minimum Air Terminal Location Clearances THERMAL SWITCH Typical Vent Installations REPLACEMENT...
  • Page 3 CONTINENTAL® products are manufactured under the strict Standard of the world recognized ISO 9001 : 2000 Quality Assurance Certificate. CONTINENTAL® products are designed with superior components and materials, assembled by trained craftsmen who take great pride in their work. The burner and valve assembly are leak and test-fired at a quality test station. Once assembled the complete fireplace is thoroughly inspected by a qualified technician before packaging to ensure that you, the customer, receives the quality product that you expect from WOLF STEEL Ltd..
  • Page 4: General Instructions

    FIGURE 1 Provide adequate ventilation and combustion air. Provide WARNING: The door for this fireplace is sold adequate accessibility clearance for servicing and operat- separately. The door must be installed and ing the fireplace. Never obstruct the front opening of the closed before operation begins.
  • Page 5: Care Of Glass & Plated Parts

    No external electricity (110 volts or 24 volts) is CARE OF GLASS, AND PLATED PARTS required for the gas system operation. Expansion / contraction noises during heating up and Do not use abrasive cleaners to clean plated parts. Buff cooling down cycles are normal and are to be expected. lightly with a clean dry cloth.
  • Page 6: Minimum Air Terminal Location Clearances

    MINIMUM AIR TERMINAL LOCATION CLEARANCES FIGURE 2 W415-0570 / B / 11.30.07...
  • Page 7: Typical Vent Installations

    TYPICAL VENT INSTALLATIONS FIGURE 4 FIGURE 3 For optimum performance, it is recommended that all horizontal runs have a 1 inch rise per foot. When terminating vertically, the vertical rise is a minimum 36 inches and a maximum 40 feet from the center of the fireplace flue outlet.
  • Page 8 DEFINITIONS ELBOW VENT LENGTH VALUES for the following symbols used in the venting calcula- feet inches tions and examples are: 1° 0.03 > - greater than 15° 0.45 > - equal to or greater than 30° 11.0 < - less than 45°...
  • Page 9 TOP EXIT / HORIZONTAL TERMINATION when (H ) > (V Example 3: Simple venting configuration (only one 90° elbow) 90° FIGURE 8 See graph to determine the required ver- 90° tical rise V for the required horizontal run FIGURE 10 = 4 ft = 1.5 ft = 4 + 1.5 = 5.5 ft...
  • Page 10 VERTICAL TERMINATION when (H ) < (V Simple venting configurations REQUIRED VERTICAL RISE IN FEET FIGURE 11 HORIZONTAL VENT RUN PLUS OFFSET IN FEET The shaded area within the lines represents acceptable values for H and V For vent configurations requiring more than zero 90° elbow (top exit) or one 90°...
  • Page 11: Installation

    INSTALLATION WALL AND CEILING PROTECTION For optimum performance it is recommended that all The 11½ inch framing dimension may be reduced to a 9½ inch opening if the vent length, from the fireplace to horizontal runs have a minimum 1 inch rise per foot using the framed hole, is 24 inches or greater.
  • Page 12: Using Flexible Vent Components

    USING FLEXIBLE VENT COMPONENTS Do not allow the inside liner to bunch up on 4. From outside, apply a bead of the high temperature sealant to horizontal or vertical runs and elbows. Keep the inside of both liners, approximately 1" from the end of each it pulled tight.
  • Page 13: Fireplace Vent Connection

    Spacers are attached to the 4" inner flex liner at prede- FIREPLACE VENT CONNECTION termined intervals to maintain a 1-1/4" air gap to the 7" outer liner. These spacers must not be removed. Elbows 1. Install the 4 inch diam- FIGURE 25 require 3 spacers, one at the start, one at the middle and eter aluminum flexible...
  • Page 14: Restricting Vertical Vents

    9. Run a bead of high temperature sealant around the Attach the two leads to terminals 1 and 3 located on the gas valve. outside of the 4" elbow. Pull the adjustable pipe a mini- mum 2" onto the elbow. Secure with 3 screws. Repeat with the 7"...
  • Page 15 FIGURE 32 PROTRUDING FINISH Non-combustible material (brick, stone or ceramic tile) may protrude over the black painted surface of the fireplace front and is required for use in conjunction with the GD425 kit. This kit is designed to accommodate a noncombus- tible material to a maximum finished thickness of ".
  • Page 16: Finishing

    FINISHING DOOR INSTALLATION CLIPS HOOD Loosely thread a screw provided with the door kit into the top hole Attach the hood by pressing the top on the left side of the firebox. Hang the door by the hinge onto the flange into the clips along the top of screw.
  • Page 17: Log Placement

    LOG PLACEMENT PHAZER logs, exclusive to Continental® Fireplaces, pro- vide a unique and realistic glowing effect that is different in every installation. FIGURES 42a-e 4. Place log #4, with the charred branch pointed inward. Locate the pins into the holes in log#1 and log#2, this will CHARCOAL STRIPS hold the rear log in position.
  • Page 18: Logo Placement

    LOGO PLACEMENT INSTRUCTIONS Remove the backing of the logo supplied and place on the glass viewing area, measuring from the glass edges as indicated. " LOGO FIGURE 46 " IN LINE SWITCH NIGHT LIGHT REPLACEMENT The FIRE LOG NIGHT LIGHT is provided with a manual "in-line" Your Continental®...
  • Page 19: Blower Installation

    BLOWER INSTALLATION BLOWER SYSTEM The Continental® comes equipped with a blower, a heat sensor, variable on/off speed control and a power cord. The blower is thermally activated, so when it is turned on, it will automatically start approximately 15 minutes after light- ing the fireplace and will run for approximately 30 minutes after the fireplace has been turned off.
  • Page 20: Operation / Maintenance

    OPERATION / MAINTENANCE After extended periods of non-operation such as following OPERATING INSTRUCTIONS a vacation or a warm weather season, the fireplace may When lit for the first time, the fireplace will emit a slight emit a slight odour for a few hours. This is caused by dust odour for a few hours.
  • Page 21: Maintenance

    MAINTENANCE TURN OFF THE GAS AND ELECTRICAL 3. Check to see that all burner ports are burning. Clean out any of the ports which may not be burning or are not POWER BEFORE SERVICING THE FIREPLACE. burning properly. CAUTION: Label all wires prior to disconnection when ser- vicing controls.
  • Page 22: Replacements

    REPLACEMENTS Contact your dealer for questions concerning prices and 1. M & S ODEL ERIAL UMBER OF FIREPLACE availability of replacement parts. Normally all parts can be 2. I NSTALLATION DATE OF FIREPLACE ordered through your Continental® dealer or distributor. 3.
  • Page 23 W415-0570 / B / 11.30.07...
  • Page 24: Trouble Shooting Guide

    TROUBLE SHOOTING GUIDE EFORE ATTEMPTING TO TROUBLESHOOT PURGE YOUR UNIT AND INITIALLY LIGHT THE PILOT AND THE MAIN BURNER WITH THE GLASS DOOR OPEN SYMPTOM PROBLEM TEST SOLUTION Main burner flame Blockage in vent. - remove blockage. In really cold conditions, ice buildup may occur is a blue, lazy, on the terminal and should be removed as required.
  • Page 25 SYMPTOM PROBLEM TEST SOLUTION - connect a jumper wire across the wall switch terminals; if main Themostat or switch is de- Pilot burning; no burner lights, replace switch / thermostat. fective. main burner; gas knob Wall switch wiring is defec- - disconnect switch wires &connect a jumper wire across terminals is on 'HI';...
  • Page 26 W415-0570 / B / 11.30.07...

This manual is also suitable for:

Cdv70pt-s

Table of Contents