Positioning Detachable Blower (Power Head Assembly) - RIDGID WD16800 Owner's Manual

16 u.s. gallon/ 60 liter professional wet/dry vac
Hide thumbs Also See for WD16800:
Table of Contents

Advertisement

Available languages

Available languages

SP6779-1 Ridgid WD1680
Positioning Detachable Blower
(Power Head Assembly)
1. To remove the detachable blower from
the lid assembly, press down on the
detachable blower latch under the
detachable blower handle and lift the
blower off the lid of the Vac.
Detachable
Blower
Latch
2. To replace the detachable blower onto
the lid assembly, position detachable
blower above the indented area of the
lid assembly. Rotate the detachable
blower down until the travel of the unit
stops.
12/21/10
4:07 PM
Page 9
3. Lightly press down on the carry handle
Detachable
Blower Handle
Detachable
Blower Latch
Detachable
Blower
Molded
Leads
4. Your new Wet/Dry Vac is ready for
Press and Pull
Release
Button
9
of the detachable blower until you
hear the "snap" of the detachable
blower latch engaging the detachable
blower. The detachable blower is now
latched to the lid assembly.
use. With the Wet/Dry Vac completely
assembled and ready for use, insert
the push button end of the "Tug-a-
Long" hose into the inlet of the Vac.
The hose should snap into place. To
remove the hose from the Vac, press
the release button in the hose
assembly and pull the hose out of the
Vac inlet, as shown.
Detachable
Blower

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wd1680ex0Wd1680ex

Table of Contents