Direct water heaters

Advertisement

Cold Start Boiler Application - Priority Figure 3b.
Opera�on: 
When any thermostat calls for 
heat, appropriate circulator is energized and 
the isolated end switch (X‐X) will start the 
boiler. 
Priority Opera�on: 
switched to the priority se�ng and is ac�vat‐
ed, all other zones will stop opera�on un�l 
zone 6 is sa�sed. When Zone 6 is not 
switched to priority, all zones will operate 
independently. 
When Zone 6 is 
Jumper Placement:  
be placed between terminals ZC and ZR. Con‐
nect the isolated end switch to the aquastat 
on the boiler 
Power input: 
Connect 120 volt as power 
input to terminals N and H. Neutral wire to 
terminal N. Hot wire to terminal H. 