Water-Loo Portable Skid Toilet Operation Manual page 4

Table of Contents

Advertisement

(Microphor #39014 bare or #95008 valve w/fittings)
If the A/W sequence valve becomes erratic the following
trouble shooting action can be taken:
A. Flush Button Sticks: If the flush button becomes
sticky and does not press down and return
freely, apply silicone lubricant directly onto the
shaft, press up and down until free.
B. Flapper Stays Open and Will Not Close: clean or
replace Bleed-Off Plug, Lubricate Air Cylinder
Rod.
C. Flapper will open and close rapidly, not allowing
unit to go through full cycle:
1. Check for air leaks
2. Hole in Bleed Plug could be oversized
due to wear or damage, replace plug.
3. Check valve in bottom cap of A/W is
malfunctioning:
a. Remove hoses attached to bottom of
valve (#1 & #2).
b. Unscrew bottom (#6) from valve.
c. Using a 7/16 nut driver, remove spring
retainer nut (#3) from inside of bottom
cap. Do not lose spring (#4) when
removing small check valve with rubber
O-ring (#5).
d. Clean all parts – blow out air passages
in bottom cap and needle before
reassembly.
e. Re-assemble in reverse order of above.
TOILET HOPPER and COMPONENTS
Shown left to right to left are the following components:
Top Row:
1. Hopper Top w/Flapper, P/N 90040
2. Hopper, bottom only, P/N 90041
3. Hopper, complete, P/N 90039 (does not include
air cylinder)
4. Crank Assembly only, P/N 90042
5. Air Cylinder, P/N 94560
6. Flapper Assembly only, P/N 90048
7. Hopper O-Ring Seal, P/N 27270
Note: these are Microphor part numbers
TREATMENT TANK FUNCTION
In the treatment tank, solid waste and toilet paper is
broken down by bacteria into liquid and gas. The gas
escapes out the tank vent. The liquid then flows through
the filters to the bottom of the treatment tank, then into
the chlorinator. Microphor recommends adding a cup of
Micro Culture monthly to insure proper operation.
TREATMENT TANK VENT
The vent in the treatment tank is a key part of the
Microphor treatment process. The vent allows oxygen
into the tank and also allows co
This exchange is critical to the decomposition process.
Treatment Tank Vent
4
2
gas out of the tank.

Advertisement

Table of Contents
loading

Table of Contents