Exhaust Air Ducting; Installation Examples - TOTALINE P707 Installation And Operation Instructions Manual

Heat recovery ventilator
Table of Contents

Advertisement

INSTALLATION EXAMPLES — It is the responsibility of
the installer to ensure all ductwork is sized and installed as
designed to ensure the system will perform as intended. All air
movement devices have a performance curve. The amount of
air (cfm) that an HRV will deliver is directly related to the total
external static pressure (E.S.P.) of the system. Static pressure is
a measure of resistance imposed on the blower by length of
duct work/number of fittings used in ductwork, duct heater etc.
BEDROOMS
1800 MM
FRESH AIR
EXHAUST AIR
Fig. 14 — Fully Dedicated System
BEDROOMS
MIXED SUPPLY /
VENTILATION
AIR
TWO SPEED
FURNACE
1800 MM
FRESH AIR
EXHAUST AIR
Fig. 15 — Partially Dedicated System
Fully Dedicated System (New Construction) — Stale air is
drawn from key areas of home (bathroom, kitchen, laundry).
Fresh air is supplied to main living areas. The HRV must be
balanced. See Fig. 14.
Partially Dedicated System — Stale air drawn from key areas
of home (bathroom, kitchen, laundry) Fresh air supplied to
main living areas via the forced air system. HRV must be bal-
anced. See Fig. 15 and 16.
EXHAUST
BATHROOM
CENTRAL CONTROL
(OPTIONAL)
FRESH AIR TO
LIVING ROOM
HRV
460 MM
EXHAUST
CENTRAL CONTROL
(OPTIONAL)
BATHROOM
RETURN AIR
THERMOSTAT
HRV CONNECTION
HRV
460 MM
5
SUPPLY
EXHAUST
FURNACE

Advertisement

Table of Contents
loading

This manual is also suitable for:

P707-shr1504P707-shr2004

Table of Contents