Aerator Equipment; Electrical/Pcc Installation - Otterbine/Barebo Concept3 Owner's Manual

Otterbine barebo concept3 aerating fountain
Table of Contents

Advertisement

Unpack and inspect your aerator, report any damage to the carrier that delivered your aerator. Make sure you
have received the following:
5. Warranty Registration Card - make sure to fill in your Otterbine warranty registration card and send it
back to the factory so that we can send you our bi-annual customer newsletter, which will keep you up to date
on all the latest aeration news. WARRANTY IS VOID UNLESS CARD IS RETURNED.
This weather resistant NEMA 3R Power Control Center comes complete with a twenty-four hour on/off timer,
magnetic contactor with overload relay, surge arrestor, disconnect, overcurrent protection, HOA switch, and
ground fault protection (where applicable). All internal connections are pre-wired. All electrical specifications
are located on the door of the Otterbine Power Control Center. Otterbine recommends that all ELECTRICAL
WORK BE DONE BY A QUALIFIED, LICENSED ELECTRICIAN. Make sure that all electrical work
conforms with local, state and national electrical codes.
NOTE: Otterbine suggests coordinating electrical installation with physical installation. The electrician will
need to be on hand for a one minute dry-run test of the unit and will also need to check the running amperage
after installation. These electrical tests are a crucial part of the installation process and should not be
ignored.

Aerator Equipment

1. Unit - you will find a label located on the housing of the unit.
Check the label to make sure you have received the correct
horsepower and voltage aerator.
2. Float - including hardware kit to mount float to the unit or
extra hardware kit if float already mounted to unit
3. Power Control Center - you will find a label inside of the
Power Control Center door. This label lists the voltage and
horsepower of the control center. Verify that the aerator and
control center are the same horsepower and voltage.
4. Power Cable Assembly - verify that you have received the
correct length.

Electrical/PCC Installation

A. Install the Otterbine Power Control Center as close to the pond as possible.
CAUTION: The Power Control Center should not be accessible from the water.
ATTENTION: la loite de control ne doit pas être accessible de l'eau.
WARNING: Screw connections may loosen during shipping, verify that all screw
connections are tight before energizing PCC.
CAUTION: Otterbine recommends that the PCC not be mounted in direct sun
light when installed outdoors.
B. Your Otterbine Power Control Center can be mounted indoors or outdoors.
1. When mounting outdoors Otterbine suggests that you use a piece of exterior
plywood and sturdy 4 x 4 post(s).
2. When mounting indoors the PCC can be mounted directly to the wall.
4

Advertisement

Table of Contents
loading

Table of Contents