Preparation For Work And Safety Requirements; Ecr Installation And Prevention; Placing The Paper Roll - Digitron D110 User Manual

Electronic cash register
Table of Contents

Advertisement

2. PREPARATION FOR WORK AND SAFETY REQUIREMENTS

2.1. ECR installation and prevention

When the ECR is delivered and unpacked, it must be examined for eventual
mechanical damages, for the integrity of the seal and the product completeness.
The ECR must be protected from direct sun light, heat sources, strong electro-
magnetic fields, high humidity, liquids and dust. The paper roll compartment and
the adjacent area should be regularly cleaned with a slightly damp cloth. The ECR
should be protected from mechanical damages.
During printing and for some time after printing, the printing head is very hot and
should not be touched.
If some damage or malfunction of the ECR is detected, the ECR operations must
be stopped, the ECR must be switched off and unplugged and a service technician
must be called. Only authorized service technicians are permitted to repair the
ECR.
Safety regulations, recycling regulations, electrical safety rules etc. must be
strictly observed with regard to the ECR.

2.2. Placing the paper roll

Before starting operations with the ECR, the operator has to check the available
paper roll in the ECR and place a new one, if necessary. The ECR has the
advantage of easy paper loading. The cover of the paper compartment must be
opened and the new paper roll must be placed. The paper tape must be pulled to
come above the cutting edge and the cover of the paper compartment must be
closed.
The key
is used for paper feeding. When a paper roll is used up, the printer
operation is blocked. The ECR displays the corresponding error message: P End .
Pressing any key is necessary after placing a new paper roll.
D110
USER MANUAL
9

Advertisement

Table of Contents
loading

Table of Contents