CITROEN C8 2002 Handbook page 62

Table of Contents

Advertisement

CHECKING AND SETTING THE VALVE TIMING
Engine : XFW
Checking the setting of the timing (continued).
Should this not be the case, repeat the operation to refit the belt.
Remove the crankshaft peg [2].
Refitting (continued).
Refit:
The power steering pump.
The support (7).
The tensioner roller assembly (1).
Tighten:
Screw (22) to 2.5 m.daN + LOCTITE FRNETANCH.
Screw (23) to 4.0 m.daN + LOCTITE FRNETANCH.
Screw (24) to 2.5 m.daN + LOCTITE FRNETANCH.
Screw (25) to 6.0 m.daN + LOCTITE FRNETANCH.
Tighten the crankshaft pulley screws to 2.5 ± 0.2 m.daN.
Refit the auxiliary drive belt (see corresponding operation).
Complete the refitting operations in the opposite order to removal.
B1EK00JD
60

Advertisement

Table of Contents
loading

Table of Contents