3. Once the mast is straight side to side, increase tension of upper shrouds taking an equal number of
turns per side, until the fore and aft pre-bend induced reaches approximately 1 ½ inches.
4. The lower shrouds should be adjusted slightly looser than the uppers. The shrouds will help
control the amount of pre-bend in the rig.
NOTE: Rigging tensions may be measured with LOOS & Co. Model B tension gauge.
Catalina 250 Owner's Manual
Page 19