Toshiba Satellite U500 Maintenance Manual page 182

Hide thumbs Also See for Satellite U500:
Table of Contents

Advertisement

Installing the Touch pad board
To install the touch pad button, follow the steps below and refer to Figures 4-21 and 4-22.
1. Install the touch pad board to the slot and secure it with 2 screws.
M2×3L
2. Connect the FPC cable that connecting the touch pad board with the touch pad,
connect the touch pad board FPC and paste one piece of tape to fix it.
4-40 Satellite/Satellite Pro U500/U500D, PORTEGE M900/M900D
FLATHEAD screw
4 Replacement Procedures
×2
Maintenance Manual

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Portege m900dDynabook

Table of Contents