Siemens AP75 Service Manual page 28

Hide thumbs Also See for AP75:
Table of Contents

Advertisement

AP75 Level 2 Service Manual
Final Inspection:
The final inspection contains:
1) A random sample checks of:
- Data reset (if required)
- Optical appearance
- complete function
2) Check if PIN-Code is activated (delete the PIN-Code if necessary).
Basis is the international standard of DIN ISO 2859.
Use Normal Sample Plan Level II and the Quality Border 0,4 for LSO.
Remark: All sample checks must be documented.
Copyright © Siemens Pte Ltd.
All Rights Reserved
COM D CCQ APAC PS
Siemens Technical Support Centre
Page
of
28
28
Internal Use Only

Advertisement

Table of Contents
loading

Table of Contents