Checking Your Humidifier Operation - Honeywell HE220A Owner's Manual

By-pass flow-through humidifiers
Hide thumbs Also See for HE220A:
Table of Contents

Advertisement

Available languages

Available languages

End of Humidification Season
Clean the humidifier and shut it off at the end
of the heating season. Use the Every 1 to 3
Months section, steps 1 through 18 to shut
down for the season.
IMPORTANT
Be sure the humidifier power is off.
Vacation
When leaving on vacation, turn off the humid-
ifier water supply and your humidity control.
Turn on the humidifier water supply and reset
your humidity control when you return.
CHECKING YOUR
HUMIDIFIER OPERATION
After winter startup or servicing, use the
following steps to check the humidifier
operation:
1. Turn on the humidifier power and water
supply.
2. Turn the H908A Convertible Humidity
Control to the highest setting, or the
H1008A Automatic Humidity Control to
the test position, and set the thermo-
stat to 10°F (6°C) above the room
temperature.
HE220A,B AND HE260A,B BY-PASS FLOW-THROUGH HUMIDIFIERS
7
NOTE: The H1008A Automatic
Humidity Control stays in the
test mode for thirty minutes.
After thirty minutes, the
control automatically resets to
the maximum frost factor
setting. If system checkout
has not been completed in
thirty minutes, the test mode
can be extended by turning
the dial back to one of the dial
settings and then returning it
to the test mode.
3. Observe that water is flowing out of the
drain hose.
NOTE: The furnace blower must be
on to activate the humidifier.
4. Reset the thermostat and H908A
Convertible Humidity Control to a
comfortable setting or the H1008A
Automatic Humidity Control to the
desired frost factor setting, for auto-
matic operation.
69-1111EF—1

Advertisement

Table of Contents
loading

This manual is also suitable for:

He220bHe260aHe260b

Table of Contents