Side Shelf Handle Assembly & Battery; Battery Installation - Jenn-Air 720-0336 Instructions Manual

Stainless steel lp gas grill
Table of Contents

Advertisement

SIDE SHELF HANDLE ASSEMBL
Estimated Assembly Time: Approximately 5-7 minutes
Required Tools: Phillips Screwdriver
1. Remove the four side shelf handle
2. Align the hole
s in the side shelf handle with the holes in the side shelf.
3. Insert the sc
rews and tighten.

BATTERY INSTALLATION

1.
Remove the ignition button housing.
2
.
Insert the b
attery into the housing with the positive (+) terminal facing outward.
3
.
Replace the ignition button housing after the battery has been installed.
Y
screws from the side of the shelf.
5 00
400
600
300
7 00
200
800
100
7
400
500
600
30 0
700
200
8 00
10 0

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents