Weil-McLain ECO 70 Manual page 14

Wall mount gas-fired water boilers
Hide thumbs Also See for ECO 70:
Table of Contents

Advertisement

TM
-
G
AS
FIRED WATER BOILER
Converting boiler to propane — ECO 70/110
Installing the propane gas orifice bushing (some details omitted for clarity)
7. See Figure 12. Insert the propane gas orifice bushing (item 4) into
the gas valve outlet as shown.
8. Press the bushing into the gas valve outlet until the bushing flange
butts against the gas valve outlet.
Inspect the O-rings on the propane gas orifice bushing
an on the gas valve outlet (item 5, Figure 12). The O-
rings must be in good condition and must be installed.
Failure to comply will cause a gas leak, resulting in severe
personal injury or death.
9. Reposition gas valve into the venturi and reinstall the gas valve
retention ring (item 3, Figure 12).
eter fluid contamination. Failure to comply could result
in severe personal injury, death or substantial property
damage.
10. After installation is complete, attach the propane conversion label
(in conversion kit bag) next to the boiler rating plate.
11. Perform complete start-up sequence (beginning on page 75),
including check for gas leaks and checking for proper operation.
12. Reinstall jacket door.
14
The valve could be damaged by manom-
— Boiler Manual
1
Gas valve
2
Venturi
3
Gas valve retention ring
4
Propane orifice bushing with o-ring
5
Gas valve o-ring
6
Pressure reference hose — LEAVE CONNECTED AT
BOTH ENDS
(cont.)
for Figure 12
DO NOT oper-
ate the boiler with the jacket door
removed except for inspection and
testing as directed in this manual.
Part number 550-142-122/0513

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

110155Eco 110Eco 155

Table of Contents