Bradford White TTW 75 SERIES Service Manual page 27

Table of Contents

Advertisement

Simulated Resistive Device Testing
Step 1.
Position power switch on gas control to the
"OFF" position.
Step 2.
Disconnect simulated resistive device from
gas control.
Step 3.
Using a multi-meter set to the ohms setting
check resistance of simulated resistive
device. Resistance must be within 25,000
ohms and 45,000 ohms. If outside of this
range replace simulated resistive device.
Multi-meter set to
ohms setting
Electronic
"pin type"
Meter Probes
TTW SERVICE PROCEDURE VII
Simulated Resistive Device Testing
Simulated Resistive
device
Simulated Resistive
device
Page 27
27

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents