Post Installation Checks; Brick Installation - Lennox Hearth Products ST310 Installation And Operation Manual

Free-standing epa certified wood-burning stoves country collection
Table of Contents

Advertisement

POST INSTALLATION CHECKS

1.
Check that all chimney pipe joints are securely fastened.
2.
Check that the heater is securely fastened to the floor (if appli-
cable).
3.
Make sure the intake vent has clear access to outside air (if ap-
plicable).
4.
Make sure the outside air vent has been sealed properly to keep
rodents out (if applicable).
5.
Be sure all roof flashings are watertight.
6.
Be sure the stove is properly grounded (if applicable).
FOR YOUR OWN PROTECTION AND INSURANCE PURPOSES,
HAVE YOUR CHIMNEY AND CONNECTOR PIPE INSTALLATION
INSPECTED BY YOUR LOCAL BUILDING CODE AUTHORITY OR
FIRE MARSHAL BEFORE STARTING A FIRE IN YOUR STOVE.
NOTIFY YOUR INSURANCE COMPANY.

BRICK INSTALLATION

CAUTION: Wear gloves during brick installation in case of
sharp edges inside the stove.
Note: Installation of the baffle boards and baffle blankets are easier
when you can still access the flue outlet (before connecting flue vent).
Be sure the baffle blankets are placed flat on the baffle boards so as
not to block exhaust flow to the flue. Use a ruler or piece of kindling
to reach over the baffle blanket to be sure it is completely flat on top of
the baffle bricks.
Measure bricks before installing, as per list of dimensions on next page,
to be sure the correct bricks are installed in the correct location.
14
1.
Install bricks #1-34 in the numbered sequence shown in Figure 14
on the following page. Note: Bricks # 22-25 lean up against the
lower air channel and butt against bricks #17-21 on the bottom of
the stove.
Note: Before installing your baffle boards make sure the stainless
steel tube support and front and rear tube hangers are centered
side to side and that the front and rear hangers are hooked onto
the stainless steel pins protruding from the rear of the airwash and
the stove back.
2.
Next, you will install the baffle boards. All 4 baffle boards included
are the same size (15-1/2" X 6-3/16"). You will start by installing
the boards in the center part of the unit on top of the secondary
tubes to each side of the baffle support with the 15-1/2" side of
the baffle board going from the front to back of the unit. Once you
have the first two boards installed slide the board to the left side of
the baffle support all the way to the left and rear of the unit. You
will slide the board to the right side of the secondary support to the
right and rear of the unit. Next you will install the two remaining
boards where you originally installed the first two boards on each
side of the baffle support and pushed against the rear of the unit.
The stainless steel support hanger should be centered left to right
between the sets of baffle boards and placed as shown in Figure
15 on Page 15.
3.
Also included with the unit are two 17" x 12-7/16" x 1" thick baffle
blankets. Install each blanket above the baffle board to each side
of the secondary support with the 17" side of the blanket from front
to rear of the unit. Make sure that the baffle blankets are to the full
rear of the unit.
CAUTION: Make sure that the baffle blankets are centered
side to side and rest flat on the baffle boards and do not
project beyond the front edge of the baffle boards.
NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Canyon st310

Table of Contents