Figure 2 – Ggc-E101 Stowed; Deployment - WATSON INDUSTRIES GGC-E101 Owner's Manual

Gps gyro compass system gps module and dual antenna system
Table of Contents

Advertisement

Wire straps
Metal clasp
Antenna arm
Antenna assembly
straps
Figure 2 – GGC-E101 Stowed

Deployment

After the unit is aligned and connections have been completed, the antennas can be deployed. See
Figure 3 for information on deploying the antennas. First open the two straps that secure the
antenna assembly. Now pivot the assembly up and toward the side of the case. Be careful not to
pinch your fingers between the antenna assembly and case side. Next swing the left-hand antenna
arm counterclockwise until it is fully extended. Please note that the antenna arms are secured with
Velcro patches. Use the left-hand metal clasp to secure this antenna arm in its extended position.
Now swing the right-hand antenna arm counterclockwise until it is fully extended. Use the right-
hand metal clasp to secure this antenna arm in its extended position. The GGC needs an
Watson Industries, Inc.
GGC-E101 Rev A 08/30/2013