26-27 Technical Data ……………………………...…………… Thank you for selecting Steam Planet Corp Computerized Steam Room, we hope that our exquisite design will meet your life’s needs; it’s our honor to promote your health and longevity with comfortable enjoyment. In order to operate and use the product well, please read carefully and follow all instructions provided in this User’s Manual.
GENERAL INFORMATION Units come broken down in panels and are assembled with screws, nuts and bolts on site. All seams and joints are to be caulked with 100% silicone at room temperature (no latex caulking) Note: It is advised to have base onsite before preparing drain location. All shower bases need to be leveled in its final resting position, mark the placement, then pull base out and begin assembly.
Page 6
System Electric Data Size (mm/inch) Voltage Power Frequency Length Width Height M-A020 220V 3.5kW 50~60Hz 950/37 950/37 220/86 P a g e REV 03/2012...
Rough-In Diagram Diagram Key: a. Hot Water Inlet b. Cold Water Inlet c. Phone Hook-up d. Power Hook-up e. Ø40 Drain Hole Drain Disclosure NOTE: a flexible drain hose is provided with the unit. We strongly recommend taking off the flex drain hose and hard pipe the unit into existing drain.
Page 8
Attention: do not put anything in the safe area, the distance between the top shower cover and ceiling should be greater than the safe area. Room must be left clear on both sides of the shower. P a g e REV 03/2012...
Unit Features Diagram 1. Check the unit as soon as it arrives. Note if there is any shipping damages, then notify the distributor. 2. Check the water and the electronic system and ground are suitable for installation. 3. At least two people will be needed for installation. 4.
Installation 1. Connect the shower hose with shower outlet (on the back panel), then put the hand- held shower on the sliding bar. 2. When using the foot massage, open the cover first. 11 | P a g e REV 03/2012...
Page 12
3. Put the shower tray on the selected area (using are of this product), check whether it is leveled, then adjust the foot screws (under the shower tray) to make sure it is leveled. Note: level all feet on the supporting bar. 4.
Page 13
5. Slide the left and right fixed glass into the aluminum column, just as shown in the diagram. 13 | P a g e REV 03/2012...
Page 14
6. Slide the completed fixed glass door frame into the corner aluminum fitting, just as shown in the picture. 7. Uplift the front fixed glass door frame onto the bottom basin, and slide the corner aluminum rail into the two fixed glass doors. 14 | P a g e REV 03/2012...
Page 15
8. Place the roof onto the booth, connect the roof and the aluminum backboard with M6X16 screws, and connect it with the aluminum fitting by ST4X16. 9. Adjust the rollers to allow the doors to move freely, finally, install the handles and the shelf in accordance with the method shown.
Page 16
Connect the pipes in the package with the drain outlet on the steam generator and the drain exit; fasten it with the M4X16 round head screw; as shown. Pull the top shower pipe through hole on the top cover. Connect to the shower head.
Page 17
Connect the braided cold and hot water hoses, the red one is for hot water, blue is for cold. Seal the connection with Teflon tape. 17 | P a g e REV 03/2012...
Page 19
After connecting the hot and cold water, rotate the temperature knob, in accordance with the temperature scale in the dial, you can adjust the different temperature, rotate the middle knob, this shuts the water on and off. Rotate the water diverter function knob;...
Troubleshooting Guide Situation Malfunction Possible Failure Reason Solutions Display 1. Power line not connected or no 1. Correctly connect or wait for the power supply electricity supply to resume. No display on the 2. Insufficient power 2. The power must reach the required Will not run monitor 3.
Replacing Door Rollers 1. Remove plastic cover from roller 2. Loosen the nut 3. Turn the 6 sides plastic cover Left or Right for release the door on Top and Bottom of door. Note: the roller is off set to loosen or tighten the door to the frame 4.
Replacing Glass 1. Take off side rails 2. Unscrew the 2 top and bottom screws on side of frame 3. Unscrew 1 top and bottom screw on the inside of the rail 4. Gently take out the glass and frame section 5.
Page 23
6. Put back new section (check left or right, label is located on glass) 7. Reattach 2 top and bottom side frame screws 8. Reattach 1 top and bottom inside rail screws 23 | P a g e REV 03/2012...
Cleaning and Maintenance 1. When it comes to daily cleaning, liquid detergent and soft cloth should be used. DO NOT sterilize it with acetone and ammonia detergents. Do not use detergent with formic acid or formaldehyde. Do not use any abrasive cleaners. 2.
Main Control Panel 1. LCD 2. Massage Jets Function 3. Rainfall Shower Head Function 4. Telephone Function 5. Fan Function 6. Radio / CD Function 7. Top Light Function 8. ON/OFF 9. Steam Function 10. Function Key 11. – Key 12.
Introduction to Functions 1. ON/OFF 2. Light Lamp Function 3. Circulation Fan Function 4. Steam Function 5. Steam Time Function 6. Steam Temperature Function 7. Radio Function Description of Functions 1. ON/OFF Key Under ON state, press key on the panel or remote control key to start the system, the top light will come on, and functions will be activated and illuminated on the LCD display.
Page 28
Caution: Setting aroma jar must screw the nut when the testing line from control box and connect to the water level probe of Aroma jar. If the nut is too loose, between the inside of the probe and the jar wall, the probe will not work during testing.
Technical Data Work Condition and Features Rated Voltage AC220V Rated Frequency 50 - 60 Hz Rated Current 6.9A Rated Power 1520W Insulation > 20M Ω Waterproof Grade IPX4 Resistance Loading Configuration Data Load Rated Load Voltage Rated Load Frequency Rated Load Power Others Steam AC220V...
Need help?
Do you have a question about the M-A020 and is the answer not in the manual?
Questions and answers