HP 5920 Series Installation Manual page 17

5920&5900 switch series
Hide thumbs Also See for 5920 Series:
Table of Contents

Advertisement

Figure 19 Identifying the mounting and grounding positions of the HP 5900AF-48G-4XG-2QSFP+
1
(1) Auxiliary grounding point 2
(3) Primary grounding point
(5) Front mounting position
Attaching the mounting brackets and chassis rails to the chassis
To attach the mounting brackets and chassis rails to the switch chassis:
Align the mounting brackets with the screw holes in the rear mounting position or front mounting
1.
position. See
Use M4 screws (supplied with the switch) to attach the mounting brackets to the chassis.
2.
Align the chassis rails with the rail mounting holes in the chassis:
3.
If the mounting brackets are in the rear mounting position, align the chassis rails with the screw
holes at the front of the side panels. See
If the mounting brackets are in the front mounting position, align the chassis rails with the screw
holes at the rear of the side panels. See
Use M4 screws (supplied with the switch) to attach the chassis rails to the chassis.
4.
NOTE:
Secure the mounting brackets and chassis rails to both sides of the chassis in the same way.
Connecting the grounding cable to the chassis
CAUTION:
The primary grounding point and auxiliary grounding point 1 are located on the left side panel. If you use
one of these grounding points, you must connect the grounding cable to the grounding point before you
mount the switch in the rack.
Figure 20
and
Figure
2 3
(2) Rear mounting position
(4) Auxiliary grounding point 1
21.
Figure
20.
Figure
21.
13
4 5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents