Figure 5-2 Torque Sequence - Motorola BLE Series Installation And Operation Manual

Ble series broadband line extender
Hide thumbs Also See for BLE Series:
Table of Contents

Advertisement

5-2
Installation
9
Check the ac voltage setting (jumper J1, Figure 2-6).
J1 position
Description
The voltage must be greater than 38 Vac as read with a true rms voltmeter or 42 Vac
LO
when using a conventional, average reading, ac voltmeter.
The voltage must be greater than 55 Vac when read with a true rms voltmeter or 61
HI
Vac when using a conventional, average reading, ac voltmeter.
10
Check the dc voltage. Verify that it is between 23.6 V and 24.4 V and re-install the input
pad.
11
If necessary, rebalance the amplifier following the instructions in Section 3, "Amplifier
Setup."
12
Check the tightness of the electronics chassis cover screws (10 to 12 in-lbs.) and electronics
chassis hold-down bolts (18 to 22 in-lbs.).
13
Check the condition of the RF and weather gaskets and replace them if necessary. If needed,
also apply a light coating of silicone grease.
14
Close the housing and use a torque wrench to sequentially and progressively tighten the
housing bolts to a final torque of 6 ft-lb in the sequence specified on the housing cover and
illustrated in Figure 5-2.
Figure 5-2
Torque sequence
4
5
BLE*/* Installation and Operation Manual
2
1
6
M
3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ble87s/hBle87s/g

Table of Contents