Pump Priming; Priming Water Level - GE OSMONICS TONKAFLO QS1800V Series Installation, Operation And Maintenance Manual

Centrifugal pumps with quiet , stainless steel vertically mounted, flow-cooled motors
Table of Contents

Advertisement

3.5
Pump Priming - IMPORTANT!
QSV pumps are not designed to be self-priming.
WARNING:
Discharge
Inlet
WARNING:
THE INLET PIPING, MOTOR MODULE AND PUMP LIQUID END MUST
BE COMPLETELY FILLED WITH LIQUID (PRIMED) BEFORE START-UP
(Figure 3.4, Priming Pump Level).
Figure 3.4

Priming Water Level

THE PUMP MUST BE SHUT-OFF IMMEDIATELY IF PRIME IS LOST TO
AVOID POSSIBLE DAMAGE TO THE INTERNAL PARTS OF THE MOTOR
AND LIQUID END.
9
Water Level

Advertisement

Table of Contents
loading

Table of Contents