Figure 20. Positioning the Cables Away From the Slide Rails
12. Slide the server all the way into the rack and secure it with the six screws
removed in Step 4. See Figure 13A.
13. Route the AC cables over the three tie-wraps and secure the tie-wraps. See
Figure 21A.
Figure 21. Securing the Cables
14. Slide the two pins on the inside of the rear door into the hinges on the
cabinet. See Figure 12D.
15. Secure the ground cable to the server rear door with the screw removed in
Step 2. See Figure 12A.
16. Close the rear door.
17. Plug the AC power cable into the dedicated AC connector.
A
A
AC Cables
A
A
Secured AC Cables
Express5800/1080Xd Installation Procedures 17