Cisco 6200 User Manual page 25

Advanced digital subscriber line access multiplexer (dslam)
Hide thumbs Also See for 6200:
Table of Contents

Advertisement

78-5296-02
10/02/98
Table 1-9
LED
POWER
READY
PRIME
SEC
Ports 0 to 7
SLC 8CAP LEDs
Color
Condition Indicated
Green
The SLC is receiving power.
Green
The SLC is experiencing no problems.
Yellow
At least one port on the SLC is in line test mode.
Off
The SLC is not communicating with the MPC. This is the case when
• The SLC is initializing.
• The SLC has a hardware problem. If the READY LED is off for an extended
period when the POWER LED is on, see the Cisco 6200 User Guide for
instructions on troubleshooting the SLC.
Green
The SLC is using the primary (A) bus to move information across the backplane.
Green
The SLC is using the secondary (B) bus to move information across the backplane.
(Redundant systems only.)
Green
The following conditions exist:
• The port is receiving the upstream heartbeat message regularly.
• The heartbeat message indicates the CAP PIM has HEC alignment in the
downstream direction.
• The SLC has HEC alignment in the upstream direction.
• The modems on both sides have negotiated the loop rates.
The port LEDs remain lit (green) in the presence of occasional minor alarms.
Flashing
The loop is rate-adapting (training).
green
Off
One of the following conditions exists:
• The port is experiencing an intrusive line quality test.
• The port is experiencing an intrusive CAP hardware test.
• The port is disabled or is not configured.
Hardware Description
Cisco 6200 User Guide
1
1-25

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents