Before installing the Place application, you must first determine the performance and
availability goals for your business, and then plan the hardware, network, and storage
requirements accordingly. This chapter provides some basic considerations for the
implementation. It also includes the list of hardware and software requirements.
This chapter includes the following sections:
Overview of the Planning Process
■
Supported Configurations
■
Overview of the Planning Process
Planning your implementation prior to an installation also gives you a better
understanding of the environment, and enables you to adapt faster to any future
changes in the environment setup.
This section contains the following topics:
Planning Your Environment
■
Planning for Optimal Place Performance
■
Planning Your Environment
Use the following steps to plan and prepare the product environment:
Plan and design the infrastructure, based on your business needs, for the
1.
installation. This includes:
■
■
■
■
■
■
Determine the size of the implementation.
2.
Identify source systems. Identify the systems that will exchange data with Place.
3.
Planning Your Installation
Meeting the hardware and associated software requirements.
Acquiring the prerequisite software (and licensing).
Setting up the load balancers and clusters.
Gathering the capacity data.
Planning the data security policies.
Designing the backup and recovery strategies.
2
Planning Your Installation 2-1
Need help?
Do you have a question about the Retail Place 12.2 and is the answer not in the manual?
Questions and answers