Trane FADA Installation & Operation Manual page 9

Packaged fresh air unit for 100% outdoor air applications, “bo” and later design sequence
Table of Contents

Advertisement

FAXA-SVX01B-EN
Installation
Receiving Checklist
Complete the following checklist
immediately after receiving unit
shipment to detect possible shipping
damage. If entry into the unit is
necessary, bridge between the unit's
main supports using multiple 2 x 12
boards.
o Verify that the unit nameplate data
corresponds to the sales order and bill
of lading (including electrical data).
o Visually inspect the unit exterior for
physical signs of shipping damage or
material shortages.
o If a unit appears damaged, inspect it
immediately before accepting the
shipment. Remove access panels and
check for interiour component
damage. Make specific notations
concerning the damage on the freight
bill. Do not refuse delivery.
o Report concealed damage to the
freight line within the allotted time
after delivery. Verify with the carrier
what their allotted time is to submit a
claim.
Note: Failure to follow these procedures
may result in no reimbursement for
damages from the freight company.
pre-installation
considerations
o Do not move damaged material from
the receiving location. It is the
receiver's responsibility to provide
reasonable evidence that concealed
damage did not occur after delivery.
o Do not continue unpacking the
shipment if it appears damaged. Retain
all packaging. Take photos of damaged
material if possible.
o Notify the carrier's terminal of the
damage immediately by phone and
mail. Request an immediate joint
inspection of the damage by the
carrier and consignee.
o Notify your Trane representative of
the damage and arrange for repair.
Have the carrier inspect the damage
before making any repairs to the unit.
Unit Storage
Isolate all side panel service entrances
and base pan openings, such as conduit
holes and supply and return air openings
from the ambient air until the unit is ready
for startup.
If relocating the unit is necessary after the
initial delivery, position the unit on the
open trailer so the inlet hood is facing the
rear of the trailer.
9