Southwest Windpower WHISPER 42 FOOT (13 Meter) TOWER KIT for SKYSTREAM 3.7 Manual

Whisper 42 foot (13 meter) tower kit for skystream 3.7 and whisper 500 wind turbine

Advertisement

SOUTHWEST WINDPOWER
3-CMLT-1028-02 REV D
WHISPER 42 FOOT (13 Meter) TOWER KIT
for SKYSTREAM 3.7® AND WHISPER 500 WIND TURBINE
Made in the USA by:
SOUTHWEST WINDPOWER, INC.
1801 Route 66
Flagstaff, AZ 86001
(928) 779-9463
SOUTHWEST WINDPOWER
Page 1 of 35

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the WHISPER 42 FOOT (13 Meter) TOWER KIT for SKYSTREAM 3.7 and is the answer not in the manual?

Questions and answers

Summary of Contents for Southwest Windpower WHISPER 42 FOOT (13 Meter) TOWER KIT for SKYSTREAM 3.7

  • Page 1 SOUTHWEST WINDPOWER 3-CMLT-1028-02 REV D WHISPER 42 FOOT (13 Meter) TOWER KIT for SKYSTREAM 3.7® AND WHISPER 500 WIND TURBINE Made in the USA by: SOUTHWEST WINDPOWER, INC. 1801 Route 66 Flagstaff, AZ 86001 (928) 779-9463 SOUTHWEST WINDPOWER Page 1 of 35...
  • Page 2: Table Of Contents

    SOUTHWEST WINDPOWER 3-CMLT-1028-02 REV D Please read this manual thoroughly before beginning assembly. If you have any questions on proper installation or usage please call either Southwest Windpower or your dealer for more information. TABLE OF CONTENTS CONTENTS Page TABLE OF CONTENTS ......................2 Introduction ..........................
  • Page 3: Introduction

    3-CMLT-1028-02 REV D Introduction This tower kit is designed specifically for the Southwest Windpower Skystream 3.7® and Whisper 500 wind turbine. To our knowledge this is the most economical and user-friendly tower kit available for the Skystream 3.7® and Whisper 500 wind turbine. The tower kits are designed to use guy wires, allowing the use of schedule 40 pipe while providing adequate strength, even in high wind conditions.
  • Page 4: Safe Installation

    SOUTHWEST WINDPOWER 3-CMLT-1028-02 REV D Safe Installation Safety is the most important consideration to take into account when installing a tower and wind turbine. It is very important to remember that any wind turbine has high speed spinning parts and can be very dangerous if not installed properly! Make sure that the Schedule 40 steel pipe used for the tower is of adequate strength, that all bolted connections are tight and the guy wire anchors are suitable for your soil conditions.
  • Page 5: Tower Kit Parts List

    SOUTHWEST WINDPOWER 3-CMLT-1028-02 REV D Tower Kit Parts List GP3-13K4 (42 Ft/ 13 m) Your tower kit includes: QUANTITY PART NO. PART DESCRIPTION 3-CMBP-1334 BASE PLATE 3-CMBP-1268-01 GUY TAB-PUNCHED (30°) (3 Holes - For Tower) 3-CMBP-1268-02 GUY TAB-PUNCHED (45°) (2 Holes - For Gin-Pole) 3-CMBP-1265 LINK—GIN POLE TO 1 TURNBUCKLE...
  • Page 6 SOUTHWEST WINDPOWER 3-CMLT-1028-02 REV D Description Quantity 10 ft ladder rated for 250lbs Concrete (2500 psi rating) 4.5 yd (0.9/anchor) Rebar –various sizes and lengths. See Anchor Details Wood blocks, bricks to lift pipe 7” above ground level Sledgehammer Heavy duty ½” drill...
  • Page 7: Unpacking, Inspection And Approval

    2. Parts NOT included in the Tower Kit must be procured locally, and should be available at a hardware store. Pipe for the tower can be purchased from a local plumbing or steel supplier. Southwest Windpower can help you find sources for lift lines, pulleys, and anchor eyebolts.
  • Page 8: Step 1: Site Selection

    Due to the high cost of shipping and the widespread availability of pipe used for the tower, Southwest Windpower does not provide these materials. Materials are readily available through most hardware stores or plumbing companies and will cost much less when purchased locally than if they were shipped from our factory.
  • Page 9 SOUTHWEST WINDPOWER 3-CMLT-1028-02 REV D assembly to satisfy your local authorities please contact us. We have an engineering analysis available for this tower kit. Pipe Length Table for 5 inch Schedule 40 Pipe 42Ft(13m) Tower (See Figure 1) No. Parts...
  • Page 10 SOUTHWEST WINDPOWER 3-CMLT-1028-02 REV D GP3-13K4L (42ft [13m]) See Fig 1.2 See Fig 1.1 Guy Wire Steel Pipe Used: 5 inch Schedule 40 Figure 1: Tower Layout SOUTHWEST WINDPOWER Page 10 of 35...
  • Page 11 SOUTHWEST WINDPOWER 3-CMLT-1028-02 REV D Figure 1.2 SOUTHWEST WINDPOWER Page 11 of 35...
  • Page 12 SOUTHWEST WINDPOWER 3-CMLT-1028-02 REV D Back Anchor 4" Above Ground Level, eyebolt flush to ground Back Guy wire Lift Pole (Gin Pole) Lift Pole (Gin Pole) Side Guy Wires Side Guy Wires Lift-Pole (Gin Pole) Anchor 4" Above Ground Level,...
  • Page 13: Step 3: Tower, Base And Anchor Layout

    SOUTHWEST WINDPOWER 3-CMLT-1028-02 REV D Isometric View Figure 2: Anchor and cable layout Step 3: Tower, Base and Anchor Layout This tower kit must only be erected on a calm day (no wind). The tower base and anchors should be laid out as described in Figure 2 and Figure 7. The tower will be assembled laying on the ground and then tilted up into position.
  • Page 14 SOUTHWEST WINDPOWER 3-CMLT-1028-02 REV D assembled to the uphill side of the base, as it will already be part way up once it is assembled. In this case the two opposing anchors should be at the same height on the hill as the tower base, one anchor should be directly uphill and one directly downhill from the tower base.
  • Page 15 Southwest Windpower to make sure your installation is safe. When your tower is being installed on an incline you must make sure that the side anchors and base anchor are level.
  • Page 16 SOUTHWEST WINDPOWER 3-CMLT-1028-02 REV D Side View Figure 3.1: Base Anchor Layout Figure 3.2: Base Anchor Detail View SOUTHWEST WINDPOWER Page 16 of 35...
  • Page 17 SOUTHWEST WINDPOWER 3-CMLT-1028-02 REV D Figure 4.1: Lift-Pipe Anchor Angle View Drawing Not to Scale Figure 4.2: Side View of Lift-Pipe Anchor (Eyebolt Flush with Concrete) SOUTHWEST WINDPOWER Page 17 of 35...
  • Page 18 SOUTHWEST WINDPOWER 3-CMLT-1028-02 REV D Drawing NOT TO SCALE " safety cable - 5ft aprox length Cable clamps Cement Anchor Figure 4.3: Above Ground Concrete Anchor View (back and side anchors only) SOUTHWEST WINDPOWER Page 18 of 35...
  • Page 19 SOUTHWEST WINDPOWER 3-CMLT-1028-02 REV D Figure 5: Tower Foundation Detail SOUTHWEST WINDPOWER Page 19 of 35...
  • Page 20 SOUTHWEST WINDPOWER 3-CMLT-1028-02 REV D Figure 6: Anchor Foundation Detail SOUTHWEST WINDPOWER Page 20 of 35...
  • Page 21: Step 4: Tower Base & Guy Wire Anchor Assembly

    SOUTHWEST WINDPOWER 3-CMLT-1028-02 REV D Step 4: Tower Base & Guy Wire Anchor Assembly Buried concrete anchors will work in any situation other than solid rock. A hole must be dug in the ground at the desired anchor point. The calculations made for this manual and anchor design are for clay soil, which is the worst-case scenario.
  • Page 22: Step 5: Assembly Of Pipe Sections

    SOUTHWEST WINDPOWER 3-CMLT-1028-02 REV D Step 5: Assembly of Pipe sections The following steps have been taken before you reach this point: 1. You have dug 5 holes. Four Anchor holes and one base hole. You have made sure they are centered and at equal distances from the center hole.
  • Page 23: Step 6: Attaching Guy Wires

    SOUTHWEST WINDPOWER 3-CMLT-1028-02 REV D The last hole to be drilled is the one in the gin pole that connects it to the steel anchor links (see Figure 4.2). This hole cannot be drilled until the anchors are in place and the assembled gin pole is bolted to the base angles.
  • Page 24 SOUTHWEST WINDPOWER 3-CMLT-1028-02 REV D Attach guy cables to the two side anchors. Again, use a cable thimble on each of the guy tabs, and also on the turnbuckles. The table in this section tells you how long to cut these cables and also how long the approximate cable length should be after being attached to the turnbuckle and the tower pipe.
  • Page 25 SOUTHWEST WINDPOWER 3-CMLT-1028-02 REV D Centerline Front Anchor (Lift Pipe) 4" Note: Lift-pipe Anchor is above Offset from Centerline ground, approximately 3.6 inches Eyebolt flush with cement Right Anchor Left Anchor 4" above 4" above ground, ground, Eyebolt 6" Eyebolt 6"...
  • Page 26 SOUTHWEST WINDPOWER 3-CMLT-1028-02 REV D Drawing NOT to SCALE (Side Guy Wires Not Shown) Figure 8: Tower Assembly Side View Drawing NOT TO SCALE " safety cable - 5ft aprox length Figure 9.1 Turnbuckle and Guy Wire attachment SOUTHWEST WINDPOWER...
  • Page 27 SOUTHWEST WINDPOWER 3-CMLT-1028-02 REV D Figure 9.2 SOUTHWEST WINDPOWER Page 27 of 35...
  • Page 28: Step 7: Grounding The Tower

    SOUTHWEST WINDPOWER 3-CMLT-1028-02 REV D Step 7: Grounding the Tower It is critically important that the tower be properly grounded before it is erected. Grounding will provide static and lightning protection for the turbine, tower, and the rest of your system.
  • Page 29 SOUTHWEST WINDPOWER 3-CMLT-1028-02 REV D This is the rope that will eventually be used to raise the tower pipe. This rope should be around 60 feet long and must have a minimum breaking strength of 8000 lbs. The slack length of this rope should allow the gin pole to rotate just past vertical.
  • Page 30 SOUTHWEST WINDPOWER 3-CMLT-1028-02 REV D 8. Move the vehicle to the other side of the tower and prepare it to begin pulling on the tower lift line. Be sure the tower lift line goes through a pulley on the anchor and is then securely attached to the vehicle.
  • Page 31 SOUTHWEST WINDPOWER 3-CMLT-1028-02 REV D 15. Install the turbine to the top of the tower by following the instructions in the wind turbine owner’s manual. The electrical wires for the wind turbine should be installed inside the tower pipe. Double check the rotor blades, tail, and tower insert are properly secured to the turbine and tower.

Table of Contents