Page 2
Parts A. Conveyor B. Chute C. Loader D. Spiral E. Quarry Base F. 2 Quarry Walls G. Spiral Support H. Rock Base I. Dump Station J. 2 Boulders K. Dump Truck L. 3 Curved Tracks M. Double Curve Track Part not shown: 1 Figure...
Page 3
Assembly QUARRY WALLS QUARRY BASE “Snap” the chute to the tabs on the quarry walls, as shown. “Snap” both quarry walls to the quarry base. SPIRAL SUPPORT “Snap” the spiral support to the tabs on the quarry walls, as shown. CHUTE...
Page 4
Assembly LOADER Beginning at the wide of the spiral, “snap” the spiral onto the posts on the quarry walls. CONVEYER ROCK BASE • First, “snap” the peg on the outside of the loader into the hole in the quarry wall •...
Page 5
Try these Layouts Lift and Load • Turn the crank on the conveyer to move boulders to the top of the spiral. Fast Dumping Action • Watch boulders roll down the spiral and into the chute. • Back the dump truck up to the dumping station and the boulder drops in.
Need help?
Do you have a question about the GEOTRAX L5888 and is the answer not in the manual?
Questions and answers