GE AEQ24 Owner's Manual And Installation Instructions page 10

Room air conditioner
Table of Contents

Advertisement

Available languages

Available languages

Installation Instructions
D PREPARETHE AiR CONDiTiONER
(continues)
[El Remove
the shipping
screws
located
on
the top of the case.
r_ Remove
the ground
screws
from
each
side of the case.
Keep it in a safe location.
NOTE: Be sure to save this screw.
You will need
them later in the installation.
@
Slide the air conditioner
from
the case by
gripping
the base pan handle
and pulling
forward
while
bracing
the case. Do not
pull or lift on the styrofoam
discharge
area.
Do not
pull
area--
damage
to the
unit may
result
FRONT
[]
Your unit may come with
internal
packaging.
This packaging
must
be
removed
prior to installing
the air
conditioner
back into the cabinet.
D PREPARETHE CASE
[_
Attach
the top rail gasket
to the bottom
of the top rail.
[]
Install the top mounting
rail with 4 type A
screws from the inside
of the case. Press
firmly
to drive the screws
into the gasket
and through
the top mounting
rail.
Top mounting roil
[]
Slide each side retainer
onto the edge of
each according
panel.
The figure
shows
the orientation
of each accordion
panel
and side retainer
assembly
relative
to the
case from a top view of the unit.
SIDE
IRE IAINEI{
\
WINDOW
FILLER
PANEL
I-D] Slide the left and right
accordion
panels
into the top and bottom
mounting
rails.
T°PL_
__
Tonight
Bottom
mounting
ra
0

Advertisement

Table of Contents
loading

This manual is also suitable for:

Aed25 seriesAeq24 series

Table of Contents