Download Print this page

Craftsman 358.797110 Operator's Manual page 5

Gutter attachment kit

Advertisement

3.Insert the notched end ofthe adapt-
erinto elbow; push parts t ogether
until the adapter snaps i nto place.
Notched
End
Tube Release
/
Button
Hole for
,/
tube release//
button
Adapter
Elbow
4. Align the grooves on the adapter
with the grooves on the blower out-
let.
5. Push the adapter onto the blower
outlet until it snaps into place
(adapter is secured by tube release
button).
6. Proceed to ALL UNITS - TUBE AS-
SEMBLY.
ALL UNITS - TUBE ASSEMBLY
1. Push the slotted end of the pivot tube
over the elbow until the flange bot-
toms out in the elbow groove.
NOTE: Be sure flange snaps into groove.
Pivot Tube
_U
Flange _=_
Elbow Groove
Elbow
2. Test rotating action of the pivot tube
by rotating the pivot tube right and
left.
3. Assemble
extension
tubes up to a
total of 4, depending
on the height
of gutter to be cleaned.
4. Thread
nozzle onto the last tube.
NOTE: Make sure threaded joints (tubes
and nozzle) are securely tightened.
5. Align the tube assembly
in a vertical
position.
6. Thread
extension tube assembly
onto the end of the pivot tube.
Pivot
Tu\
Elbow Iml
\\\\\?

Advertisement

loading