Portal Design Task List
Design Task List (6 of 7)
Table E-8
Major Phases and Tasks
Conduct Integration and System Test
4. Deployment Production
Confirm Approach
Review and Update Deployment
Implement Deployment
176
Portal Server 6 2005Q1 • Deployment Planning Guide
Subtasks
Ensure establishment of integration test environment
Identify test team and assign test scenario ownership
Train team on integration test procedures, roles, and
responsibilities
Review and revise integration test execution schedule, as required
Execute integration test
Identify and document integration test discrepancies
Resolve integration test discrepancies and document
Identify required modifications (such as configuration
enhancements, interfaces, reports)
Re-execute integration tests
Update as required
Track test progress
Obtain test approval
Summarize and communicate results to stakeholders
Review with stakeholders and establish implementation locations
and configurations
Develop implementation approach
Repeat appropriate tasks from development hardware and software
installation
Review existing documentation of results of tests
Validate scope, objectives, and critical success factors
Update deployment approach
Review and approve deployment
Review and reconcile system operations
Review organization and system procedures
Promote to production
Update current operations
Revise system release and deployment materials
Provide transition support

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Sun Java System 2005Q1 Portal Server 6 and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Portal server 6 2005q1

Table of Contents