Titan GB4145 Installation And Operating Instructions
Titan GB4145 Installation And Operating Instructions

Titan GB4145 Installation And Operating Instructions

Flooded flat-plate fast charge motive power batteries

Advertisement

Quick Links

FLOODED FLAT-PLATE FAST CHARGE
INSTALLATION AND OPERATING INSTRUCTIONS

1. SAFETY

MOTIVE POWER BATTERIES
P O S T
T H E S E
T H E BAT T E RY M A I N T E N A N C E A R E A .
PLEASE READ BEFORE PLACING BATTERIES IN SERVICE
THESE INSTRUCTIONS TO BE SHIPPED WITH
BATTERY AND TO BE DELIVERED TO USER
DO NOT USE CHAIN OR WIRE ROPE SLINGS.

2. RECEIVING BATTERIES

I N S T R U C T I O N S
RECYCLE
I N

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the GB4145 and is the answer not in the manual?

Questions and answers

Summary of Contents for Titan GB4145

  • Page 1 PLEASE READ BEFORE PLACING BATTERIES IN SERVICE THESE INSTRUCTIONS TO BE SHIPPED WITH BATTERY AND TO BE DELIVERED TO USER FLOODED FLAT-PLATE FAST CHARGE MOTIVE POWER BATTERIES INSTALLATION AND OPERATING INSTRUCTIONS 1. SAFETY DO NOT USE CHAIN OR WIRE ROPE SLINGS. 2.
  • Page 2 BEFORE PLACING BATTERIES IN SERVICE, REVIEW FOLLOW SAFETY GUIDELINES LISTED IN ITEM 1. SAFETY. 3. PLACING IN SERVICE 5. TEMPERATURE 6. CHARGING IF BATTERIES ARE NOT IN USE, KEEP THEM CHARGED. CHECK THE SPECIFIC GRAVITIES MONTHLY AND GIVE A FRESHENING CHARGE (3 OR 4 HOURS AT THE FINISH RATE) IF THE 7.
  • Page 3 WATER ADDITIONS… 9. WATER ADDITIONS EQUALIZE… DEPTH OF DISCHARGE… CLEANING… PREVENTIVE MAINTENANCE SCHEDULE… WEEKLY BATTERIES MUST BE VISUALLY INSPECTED PER THE ABOVE SCHEDULE EVEN WITH THE MONTHLY USE OF A WATERING SYSTEM. 10. SERVICE AND PARTS SEMI-ANNUAL 11. RECYCLING TROUBLE SIGNS 8.
  • Page 4 GNB Industrial Power USA – Tel: 888.563.6300 Canada – Tel: 800.268.2698 Spanish and French versions of this document can be found at www.gnb.com GB4145 2011-10 A Division of Exide Technologies...

Table of Contents