EarthQuake 9050300 Operator's Manual page 13

196cc viper earthquake chipper / shredder, 8.25 torque rated briggs earthquake chipper / shredder (ce), 11.50 & 14.50 torque rated briggs earthquake chipper / shredder, tow bar kit & vacuum kit
Table of Contents

Advertisement

Figure 26. Discharge Bag - North American Models
Install Discharge Bag
This product comes with a discharge bag for collection
of debris as it exits the discharge chute. Install the bag as
shown in Figure 26 or 27.
Add engine Oil
Refer to "Engine Oil Type and Capacity" in the Regular
Maintenance section for oil type and fill procedures.
Add Fuel
Refer to "Adding Fuel" in the Operation section for fuel
specifications and filling procedures.
1-800-345-6007
Slide bag over dis-
Lift discharge
charge chute.
chute and slide
Make sure bag
bag over chute.
noose fits over top
Make sure bag
of discharge chute
noose fits over
and notch in chute
top of discharge
bottom.
chute and notch
in chute bottom.
Pull drawstring tight.
GetEarthquake.com
Pull drawstring tight.
Figure 27. Discharge Bag - Ce Models
Initial Assembly
Slide bag over dis-
charge chute.
Make sure bag
noose fits over top
of discharge chute
and notch in chute
bottom.
Page 13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents